ADO Work Items
Backlog Basics
Pot Pourri
ADO Setup
ADO Features
100

This Work Item type level should be small enough to see progress made daily.  

What is a Task


Note:  Best Practice calls for a task to be no more than 8-12 hours so the task burn down is seen daily.  This allows for scrum masters to know where the issues are

100

Which Role in Scrum is responsible for ensuring that the Backlog delivers value?

Who is the Product Owner


100

Describes a system as having just enough features to be usable by customers while still providing value.  Allows the team to get to production at a faster rate (focuses on the "Must Haves").

What is MVP or Minimal Viable Product

100

What access level requires no additional cost or charge to use Azure Devops?

What is Stakeholder License

100

This Azure Devops System feature can be updated on the task board and moved from state to state as work is completed

What is the Card

200

This work item is made up of one or more "PBI's or User "Stories" that together provide business value.  This level of work item typically takes longer than a single sprint to complete.

What is a Feature

200

Name a characteristic of the product backlog

What is "Stacked Ranked" (Prioritized and Ordered)

200

Which of the process templates is the main process template used by Hitachi for Training internal teams-Basic, Agile, Scrum, CMMI

Scrum Process Template

200

The Access type that the majority of the development team needs to use Azure DevOps

What is Basic

200

This ADO capability allows for anyone with access to be able to analyze the project health

What is Dashboards/Queries

300

This Work Item can be described as any of these three: 

1) A "Big Piece of Work" - too large for a sprint

2) A process or sub-process

3) A business objective

Hint: Child Work Items are Features


What is an Epic


Note:  Agile Typically has 2- 3 levels of Requirements Hierarchy.  One area that Agile is not mature in is the terms to name things larger than a story/pbi.   Epic, Theme, Feature are used differently in various tools.

300

What home improvement initiative did Mark Lindberg/Dave Horstein use to create an Azure DevOps backlog?

Building a Deck

300

This work item type can be described as "unplanned work" that is needed to be completed in order to finish a PBI/User Story in a sprint?

What is Bug

300

Once the length of this has been determined and configurated it should not be changed so that the teams effectiveness can be analyzed over time and so that a level of predictability can be determined. 

Hint: PBI/User Stories should be delivered in this timebox

What is the sprint timebox


What are some reasons why Agile Training recommends 1-6 weeks for a sprint versus standardizing all sprint duration?   Differences in Technical Stacks, Integrations, Flow of Work to Done, lack of automation

300
Name the type of link used to break down work items into smaller items

What is Parent/ Child

400

This work item type is small enough to be built and tested into a sprint while still delivering Business Value

What is a PBI or User Story


PBI = Scrum Process Template

User Story = Agile Process Template.   PBI's can be written in User Story Format

400

Who should be helping the product owner to understand the business value of backlog items? 

Stakeholders, Subject Matter Experts, Process Engineers

400

This work item type makes up the majority of the Product Backlog items

What is PBI/User Stories

400

This group is for users who need to setup / configure the project in Azure Devops?

What is the Project Administrators

400

This field on the work item can be used for providing updates or requesting additional information?

What is the Discussion

500

What Work Item type will not need to have Acceptance Criteria?

A Task


Note:  The task is complete when the acceptance passes on the story/PBI

500

How much time should be allocated for backlog refinement?

As much time as needed to maintain approximately 2 sprints worth of "Ready for Work" items .  

The Refinement Meeting is typically conducted a minimum of once a week. 

Recommended 2-3 times a week with the client. Once the team has a minimum of 2 sprints worth of Ready for Work Items, it can be reduced.

500

This work item makes up the majority of the Sprint Backlog

What is task

500

When setting up an Azure Devops Environment, what 3 components are needed in order for you to work on a teams backlog?

What is Organization, Project and Team access

500

This field contains the project and the sprint 

What is the iteration path