Pumping For Days/ Dewatering
Take A Load Off Annie/Material Offload
Keep Pumping/ Concrete Pump
Just Digging It/ Excavation
100

Water must not be pumped directly onto these.

What are slopes/ sides of ditches.

100

This must be 1.5 times the height of the load.

What is the exclusion Zone.

100

These need to be completely extended before the boom is extended.

What are out riggers?

100

Must be stored a minimum of 1.2 meters away from all edges

What are spoil piles.

200

This prevents aquatic life from being sucked into the pump.

What is a fish screen.

200

Shifted Material, Securement failure, Improper loading

What are all loads assessed for?

200

This person guides mixer trucks to the pumper.

What is a spotter?

200

Trees, boulders or any other load mus not be place within this distance        of the excavation area where they create a risk of the side collapsing or falling into the excavation.

What is 1.8 Meters

300

Required to prevent hydrocarbons from hitting the ground or waterways 

What is a Spill Tray/Spill Kit

300

This is required when spotting a crane lift.

What is a gauntlet/Whistle.

300

Type of ground that is unacceptable to operate a concrete pumper on.

What is soft, or poorly compacted ground?

300

Distance between Access/Egress points in a trench.

What is 8m/25' ?

400

Installed to prevent instability or washout

What is erosion control.

400

This must be on all 3 sides of the trailer the zoom boom not working on.

What is an exclusion zone.

400

This Chemical in concrete causes burns.

What is Calcium.

400

Any disturbance within 1 meter of an existing utility must be done with this/in this manner

What is hand digging/ hyrdovac

500

8,000,000 Gallons

How much water is pumped per day?

500

Stairs, Step Ladder, platform secured against movement.

What is approved access/Egress

500

6573 Meters Cubed

How much concrete has been pumped? 

500

100,043 Meters Cubed

How much material has been excavated?