Site Preparation
Site Utilities
Soil Stabilization
Paving
Landscaping
100

This material is NOT permitted beneath footings to correct for over-excavation.

What is Fill?

100

The distance that sewer lines are installed below water service line is.

What is 5 feet?

100

When this material is mixed with lime it can effectively stabilize most coarse and medium grained soils.

What is Fly Ash?
100

The structural function of pavement is that it transfers and spreads the wheel load to which part.

What is the Foundation?

100

There are benefits of landscaping. Landscaping can improve the psychological and what other type of health of personnel working at the site. 

What is physical?

200

This persons responsibility is it to provide baselines and benchmarks during the design phase of construction.

Who is the Government?

200

When installing pipes for all sewer and storm drains the work starts at the lower end of the trench and proceeds uphill and  it should comply with what other criteria. 

What is the Bell ends face uphill?

200

When the quality of a soil layer is increased, the ability of that layer to distribute a load over a greater area will do what.

What is Increase?

200

In flexible pavements this material hold the aggregate together and provides a waterproof cover for a base.

What is Bitumen(Bituminous Binder)?

200

This material should be used prior to moving plants at other than ideal times and should be sprayed on the foliage prior to digging the plant from it original location. 

What is anti-desiccants?

300

A written approval from who is required for modifications to established elevations.

Who is Contracting Officer?

300

This type of sewer line connects a house sewer to a branch or other sewer and has no other common tributary. 

What is Lateral Sewer?

300

The process of soil stabilization is blending and mixing materials with a soil to improve the soil's strength and what else.

What is Durability? 

300

These variables will affect the final mix design which include specific uses, the binder, maximum aggregate size and what other variable?

What is Loading?

300

This type of plant can be moved in the fall after the first frost, but before the ground freezes, or in the spring after the ground thaws, but before the leaves appear. 

What is Deciduous Plants?

400

These activities are included in pre-clearing and grubbing. They are reviewing the contractor's schedule of operations, verify permits and rights-of-way, and what else?

What is Check cut-off elevations?

400

These are the methods of joining plastic pipes together.

What is Solvent Welding, Fusion Welding, Fillet Welding and Threading?



400

This type of test is used to determine relative hardness when set. 

What is pick-and-click test?

400

This type of asphalt preparation is applied to the base of the surface. 

What is the Prime Coat?

400

At what distance should a large tree be from a building?

What is a minimum of 20 feet? 

500

This is the purpose of clearing and grubbing at a construction site.

What is removing tress, timber, brush and other vegetation?

500

This term is used to refer to underground steam distribution systems.

What is Conduit and the Utilidor?



500

This subpart within the 1926 CFR is for General Safety and Health Provisions to ensure no contractor and subcontractor work in unsanitary, hazardous, or dangerous to his or her health or safety? 

What is Subpart C?

500

This type of Portland cement is used in concrete pavements when high strengths are needed very early in an operation.

What is Type III?

500

You should reject any balled and burlap wrapped plants  upon inspection if what is found. 

What is broken, cracked, soft, or pliable?