Technical Specifications
Systems
Nuclear Theory
Emergency and Abnormal Response
Procedures and Administrative
100

The Safety Limit for the NBSR

What is 842 Degrees F (450 degrees C)

100

This system provides makeup water to the thermal column and thermal shield systems

What is the Demineralized water machine (demin day tank etc.)

100

The condition of the reactor if the only known information is a steady, constant vertical trace on NC-5.

What is either critical or sub-critical.

100

What three Emergency Classifications does the NBSR define.

Notification of Unusual Event

Alert

Site Area Emergency

100

These documents set internal policies and practices for the NBSR

What are Administrative Rules.

300

A qualitative verification of acceptable performance by observation of channel behavior, or by comparison of the channel with other independent channels or systems measuring the same variable.

What is a Channel Check

300

Name ALL heat exchangers that receive secondary water from the cooling tower basin.

HE-1(ABC) HE-2, HE-6, HE-9, HE-10.

Main Primary, Purification Loop, Thermal Shield, Thermal Column, Helium Compressor.

300
The number of delayed neutron precursor groups for the NBSR

14. (6 from fuel, 8 from moderator).

300

For the three emergency classifications, what is the action level for total dose absorbed in 24 hours for each?

15mR NOUE

75mR Alert

375mR Site Area Emergency

300

What document(s) provide authorization to deviate from written procedures (and whom is the authority given to)

Reactor Supervisor may authorize changes based on AR 5.0 and TS 6.4
500

Control valves in the emergency core cooling system shall be exercised ___________

Quarterly

500

The flushing of a portion of high mineral concentration cooling tower system water down the drain, while simultaneously replacing it with fresh water.

What is Blowdown

500

For a reactor operating in the under-moderated region, an INCREASE in moderator temperature will have what effect on:

Keff

Resonance Escape Probability

Thermal Utilization Factor

Keff DECREASES

Resonance Escape Probability DECREASES

thermal utilization factor INCREASES

500

The NBSR must report a security breach affecting reactor confinement to the NRC within ______

Within 1 hour of discovery

500

During a procedural review/audit, the auditor is interested in the datasheet from the 2018 quarterly tests of the diesel generator. Where are these stored/provide a copy.

numerous places, Hard copies in control/document room. Digital scans on R:Drive.

700

If at all, when may the rundown bypass for reactor outlet temperature be place online?

During a reduction in limiting safety system settings are permissible under sections 2.2(4) and 3.3.1(1)
700

If any, name all rundowns / setpoints associated with the thermal shield system, and at which power level they may be bypassed.

consecutive tube flow low (8)

upper header flow low (100gpm)

lower header flow low (27gpm)

may be bypassed at or below 100kW power.

700

At the beginning of a reactor cycle, the reactor reaches criticality with a shim bank height of 22 degrees. Using the attached rod curve data, determine the excess reactivity and shutdown margin per TS of the NBSR

excess reactivity ~ 6.68$

SDM ~ $15

700

Who and how often reviews the emergency plan?

CRO or CROE Biennially.

700

What are the criteria for staff to be issued dosimetry form the NBSR

annual exposure likely to exceed 10% of limits in 10cfr20.

Minors to receive a dose of 10% limits in 10cfr20

Declared pregnant workers to receive dose 20% of 10cfr20 limits

Any individual entering a high rad area.

1000

Who is required to serve on the Safety Evaluation Committee and WHO is currently serving in that role.

No less than 4 members. at least two from NCNR and one from HP. director appoints all members.

includes ex officio members: CRO, CRE, Senior HP

1000

At this pressure, the Low CO2 Pressure, local audible and visual alarms clear. Vaporizer turns on

What is 245 PSI.

1000

calculate the estimated critical position for the following data.

5 deg: 100cpm

7 deg: 150 cpm

12 deg: 400 cpm

15 deg: 900 cpm

18 deg: 1600 cpm

21 deg: 2800 cpm

4 additional degrees to go critical (25 degrees total)

1000

Perform a table-top drill for a report of a rabbit sheared in the receiver.

Initial Conditions:

Steady-State operation at 20MW.

User in rabbit lab reports local radiation instrument alarming.

evaluate drill

1000

AR 1.0 list this as a conflict resolution method.

What is the A-E-I-O-U Approach


Acknowledge

Express

Identify

Outcome

Understanding