Confined Space
Subpart B
Hopper
Holds the reserve Blast Grit
What are the 2 Paint Pumps we use?
Graco Plural Component Pumps and Pump Graco Bulldog Xtreme 33 1 Airless Spray Pump
What do we use an Anemometer for?
ventilation CFM
When is a hot work ticket required?
Name these spaces
When the designation(purpose) of the space was intended to contain a flammable or combustibles.
F, E, J, D, K, M, oily waste labs, CHT
Cutting, Welding and Heating
Subpart D
Blast Pot
the main component of a blasting system that controls and holds the grit or sand used when abrasion is required
Paint Locker requirements
What test does a drager kit preform and what must you test that it does not include?
What section of the hot work ticket gives you the 10 requirements they must meet to start hotwork?
Section 3A
PPE
Subpart I
What PSI does a blast hose shoot at?
150PSI
What are the protection factors for half and full face
Half 10x Full 50x
If the CO monitor continues to span when we are certifying, what trouble shooting measures can you do?
change 9v batteries, flush with clean air. Remove from service if this doesnt work.
What oxygen range is considered inert?
Less than 6%
Toxic and Hazardous Substances
Subpart Z
Why Must a Compressor run for 15 minutes before use?
So the catalytic convertors heat up enough to burn off carbon monoxide?
What must a employee go if he has a paint injection?
ER
How long does a meter calibration from 3rd party last?
5 months
What is the difference between certifying a space for HW and limited HW? Pros and Cons of Each, where are they used?
HW guarentees all HW processes for the entire space. Limited HW gives me 35' for combustibles and 50' for flammable liquids.
Explain
Fire Protection
Subpart P
What BC Rating must fuel cell fire ext be?
60 BC
What Section of the SDS do we find Hazards Identified and Flash Points
Section 2 and Section 9
What are the ranges for Oxygen, CO, LEL, H2S, and VOC
19.6-22%, 10, 10, 0, 10
What SOP number is IMIA hot work procedure?
SOP-P-080