Change Types
BOMs
Change Control Documents
General MAP Agile
Workflow Stages
100

This change type is used to temporarily follow a process that differs from the released process? 

What is a Deviation (DVN)

100

These two items can make up a BOM 

What are Parts and Document Items

100

This supporting document lists all definitions for document types, categories, applicable workflows by type, etc.  

What is MAP Agile System Glossary (028-G185)
100

A redline is added to this tab of a change

What is the Change Attachment Tab

100

The workflow stage in which a change is ready for CA Review

What is the Submit workflow stage? 

200

This change type is required for a meta data change only

What is a Data Change (DCH)

200

This attribute tells a user the number of BOM or BOD children used in a particular assembly

What is Qty (quantity)? 

200

This document is used to identify approvers required for a QCH

QMS Approval Matrix, 028-G184

200

This tab in MAP allows a user to associate another change to a PCH

What is the relationship tab? 

200

During this workflow step, the originator adds all Acknowledgers and Approvers for the entire workflow. 

It is also a step used for facilitating feedback before moving to the approve change step.  

What is the collaborate workflow stage?

300

This change type is required to update a released drawing

What is a Product Change (PCH)

300

This field describes the manufacturing sequence of a BOM

What is BOM Line Number

300

This document is used to identify approvers required for a RCH/PCH

028-G186, Record and Part Approval Matrix 

Note:  Brooklyn Park Local Matrix

FTCVSOP035-01

300

These document types require a periodic review

What are QMS documents

300

In this workflow step implementation tasks are completed that are required prior to content being released?

What is the Pre-Release workflow step?

400

This change request is required for requesting a new global trade identification number

What is a Material Create Request (MCR)

400

This field in MAP identifies which site purchases the product

What is Buy Location(s)

400

This document is used to describe how to create a QCH

What is QMS Work Instruction 028-WI215

400

These two buttons are used to generate a PDF in the MAP system

What is the Generate PDF? and Submit PDF Request button

400

In this PCH specific workflow step, final versions of revised drawings or labels can be added. 

What is the Work In Process workflow step? 

500

This change type is required to change a part that is under development

What is a R&D Change (RDH)

500

This attribute identifies if the primary part is not available

What is Substitute

500

These approval matrices are used for DCHs

What are the QMS Approval Matrix and Records and Parts Approval Matrix

500

When an individual puts a document on a change, revises the item from Rev. C to Rev. D,  but does not include any attachments, they are likely trying to do this.

What is obsoleting a document?

500

For this PCH specific workflow step, work that was performed in the "Work in Process" workflow step is approved or rejected

What is the Approve Work workflow step. 

M
e
n
u