Classic Rock
Pubs Forms Specs Etc
ECMS
Environmental
Acronyms
100

RC Standards call for this type of rock as bedding for an inlet.

2A

100

This Pub is where you find the project office filing system.

Pub 2 (POM)

100

These components of extra work must be acknowledged by the prime contractor within 10 days of receipt in ECMS.

Work Authorizations

100

This percent of uniform vegetative coverage deems an area "fully stabilized".

70%

100

RAP

Recycled Asphalt Pavement

200

The Allman Brothers, CCR and Lynyrd Skynyrd are considered this sub-genre of classic rock.

Southern Rock

200

This form captures the 'Minimum Quality Control Plan For Field Bituminous Paving Operations'

CS-413

200

These monthly trainee forms must be submitted to PennDOT via ECMS by the 5th of each month.

EO-365 forms

200

This BMP is made on of two different size aggregates and commonly found in channels to filter the flowing water

Rock Barrier

200

MTL

Material Testing Laboratory

300

This Beatles song begins, “When I Find Myself In Times of Trouble, Mother Mary Comes to Me”

Let It Be

300

This section of Pub 408 contains the specification for subgrade drains.

Section 612

300

The ECMTS can be found in this section of your Construction project homepage.

Solicit/Construct

300

Project Team must fill out a post-storm VSIR when the rain gauge reads at or above ____ inches.

0.25

300

GFE

Good Faith Effort

400

His alter egos include Ziggy Stardust, Aladdin Sane, and Major Tom.

David Bowie

400

You'll find ADA compliant ramp standards in this RC standard.

RC-67

400

In ECMS, Contractor Labor Taxes and Insurance can be found in the blue bar at the top of the screen under this menu.

Business Partner

400

If some area is designated a migratory fish stream and the project is to perform in stream work out of the regulatory dates, who is responsible for approving the waiver for work? 

Fish and Boat Commmission

400

AASHTO

American Association of State Highway and Transportation Officials

500

This industrial byproduct is not acceptable for pipe or structure backfill, in cement concrete, or as subbase.

Steel Slag

500

This document officially states which version of Pub 408 is being used on your project.

Project Contract

500

PSA QC Review can be toggled on and off under this menu in ECMS.

Detail Information

500

NPDES stand for _______ ________ _______ _______ ________.

National Pollutant Discharge Elimination System

500

ECAMMS

Electronic Construction and Material Management System

M
e
n
u