RC Standards call for this type of rock as bedding for an inlet.
2A
This Pub is where you find the project office filing system.
Pub 2 (POM)
These components of extra work must be acknowledged by the prime contractor within 10 days of receipt in ECMS.
Work Authorizations
This percent of uniform vegetative coverage deems an area "fully stabilized".
70%
RAP
Recycled Asphalt Pavement
The Allman Brothers, CCR and Lynyrd Skynyrd are considered this sub-genre of classic rock.
Southern Rock
This form captures the 'Minimum Quality Control Plan For Field Bituminous Paving Operations'
CS-413
These monthly trainee forms must be submitted to PennDOT via ECMS by the 5th of each month.
EO-365 forms
This BMP is made on of two different size aggregates and commonly found in channels to filter the flowing water
Rock Barrier
MTL
Material Testing Laboratory
This Beatles song begins, “When I Find Myself In Times of Trouble, Mother Mary Comes to Me”
Let It Be
This section of Pub 408 contains the specification for subgrade drains.
Section 612
The ECMTS can be found in this section of your Construction project homepage.
Solicit/Construct
Project Team must fill out a post-storm VSIR when the rain gauge reads at or above ____ inches.
0.25
GFE
Good Faith Effort
His alter egos include Ziggy Stardust, Aladdin Sane, and Major Tom.
David Bowie
You'll find ADA compliant ramp standards in this RC standard.
RC-67
In ECMS, Contractor Labor Taxes and Insurance can be found in the blue bar at the top of the screen under this menu.
Business Partner
If some area is designated a migratory fish stream and the project is to perform in stream work out of the regulatory dates, who is responsible for approving the waiver for work?
Fish and Boat Commmission
AASHTO
American Association of State Highway and Transportation Officials
This industrial byproduct is not acceptable for pipe or structure backfill, in cement concrete, or as subbase.
Steel Slag
This document officially states which version of Pub 408 is being used on your project.
Project Contract
PSA QC Review can be toggled on and off under this menu in ECMS.
Detail Information
NPDES stand for _______ ________ _______ _______ ________.
National Pollutant Discharge Elimination System
ECAMMS
Electronic Construction and Material Management System