Venting
Brazing
General
Start Up
Evacuation
100

A change in pvc pipe size for venting must be made in this orientation

What is vertical

100

These are two gasses used together for brazing

What are oxygen and acetylene 

100

this size breaker is appropriate for 10 gage wire

what is 30 amp

100

Before and after charge adjustment, this amount of time should pass before declaring a proper charge

what is 15 minutes

100

Pressure testing requires 200 psi to hold for  how long without dropping

What is 1 hour

200

This is the minimum slope toward the furnace the exhaust should have

what is a 1/4 inch per foot

200

This inert gas MUST be used to displace oxygen inside the system while brazing

What is nitrogen

200

For Bryant heat pumps, the reversing valve is energized in this mode

What is cooling

200

The natural gas pressure setting for high fire at the manifold should be 

What is 3.5 inches of water column

200

A vacuum that holds decay below 1000 microns is considered to be this

What is tight and dry

300

Long radius pvc 90 elbows in 2 inch size equals this many feet in straight pipe

What is 3 feet

300

The filter dryer should be installed in this location.

What is the evaporator coil (five inches from the liquid line connection)

300

Drain traps are required on these types of installs or coils

What are air handlers or negative pressure coils (coils that suck through vs blow through)

300

In order to connect to the NFC chip on the furnace board, power must be ___

What is off

300

After evacuation, slowly open this valve first

What is the liquid line service valve

400

Horizontal portions of the venting system shall be supported to prevent sagging, for 2 inch pvc, this is the maximum spacing between hangers

What is 3 feet

400

This is the pressure to set your torch set at

What is 7 oxygen, 14 acetylene 

400

This is required where units are installed where a water leak could cause catastrophic damage to surroundings

What is auxiliary pan

400

For line sets over 15 foot long, this is the amount of additional refrigerant per foot needed

What is .6 oz per foot

400

The decay test step during evacuation is this long

what is 7 minutes

500

Type-B double wall vent pipe is required in these areas

What are unconditioned spaces

500

When purging with nitrogen, go in the _____ and out the ______

What is suction and liquid

500

When in doubt, refer to this for the answer

What is the manual

500

The propane gas pressure setting for high fire at the manifold should be 

What is 11 inches of water column

500

Best practice is to connect your micron gage at this point when evacuating the system

What is as far from the pump as possible
M
e
n
u