Grounding
PPE
Tools
Switching
Resources
100

When an EP zone is established, __________ are not required when working from the pole (within EP Zone) or a gloving aerial device

20kv gloves

100

Rubber gloves should be tested how many times a day

2

100

When working from a straight or extension ladder a __________ must be used

Belt

100

A _______ is obtained, authorizing employees to perform work, on a circuit

Clearance

100

System used to input Near Misses and Unsafe Conditions

Focus1440

200

What Kind of Grounding?

The installation of grounding jumpers at both sides of the work area.

Bracket Grounding

200

What gloves will be worn when opening a padmount in the field?

20kv gloves

200

_________ required when working from a pole, tower, structure or aerial device

Handline

200

Needed to operate any numbered switch

Switching order

200

Where can I find DCS, Safety Rule Book, and Refresher Videos

Center of Excellence

300

Lines and equipment will be treated as energized until?

Tested and grounded

300

What day of the month does IRO rubber gloves expire?

22nd

300

Handlines must never be less than ________ inch in diameter.

1/2

300

Placed to prohibit operation of the disconnecting means and indicate that employees are at work.

Hold Tag

300

What computer application do I use to put in a ticket for tech support.

IT4U

400

Max distance of over head grounds from work area.

250'

400

This meter enclosures requires additional PPE

277/480

400

Minimum length of hot stick that does not require 20kv gloves without zone marker

10'

400

What color tag is used to identify crew working on wire down. 

Orange

400

Group formed together to create safety plans and can be used to find out any safety related questions that LJASC can not answer. 

DJASC

500

Max length over head ground. 

18'

500

Risk of exposure to an arc flash

Switching 

Grounding

Exposed to open flames 

Working with hot compounds, oils, or metals

Require you to _____ in ______.

Tuck in shirt

500

Liveline tools (Hotsticks) will have an approved “safety zone marker” at least ___ inches from the hot line end.

31"

500

When work is to be performed on a feeder that would require the ______ to be turned off permission must be obtained from the appropriate Dispatcher

RC

500

305-552-4357 whos number is this?

Help Desk

M
e
n
u