What are the CWMI symbology options?
MIL-STD-2525B and MIL-STD-1477C
Shut off the air compressor when he air beams reach ______ or allow the air compressor to shut off automatically.
60 PSI
Replace/Service the mast belt when the counter on the mast reaches ___ cycles.
200 Cycles
Field level maintenance is preformed by _____.
Soldiers who use the equipment
The DCP records video of selected work stations in _____ minute blocks.
60 minute
On the CWMI Health and Status window, the status indicator color for a Degraded (DGD) unit is _______.
Amber
Although the operator can shut down the generator immediately after removing the load, the preferred procedure is to perform a cool down period of ____ before engine shutdown.
5 Mins.
When preparing the most for storage after lowering, keep the red guy lines attached a ____ o'clock and ____ o'clock.
3 and 9
How many instances of the IETM can be open at a single given time.
4
Linux has _____ classes of users.
3 classes
A Comm Node location identified in a bearing search and colored YELLOW on the map indicates a location suitability status of _______.
Fair
The KG-250X Encryptor encrypts data being transmitted/received via the _____?
BPU
What are three of the primary components of the IFCN Relay Trailer?
AIRS
PSS
NEPA
PMPS
Troubleshooting procedures may require the removal of failed equipment by ________ to restore the system to correct working order.
Field maintenance personnel
(FSR)
The command _____ is used for changing group file associations.
CHGRP
To dial a call, type the _______ operator number on the keypad in the Dial window.
Local
When lowering the Blue Sky Mast, do not tear down the antenna mast in wind speeds reaching ____ mph or higher.
25 MPH
The mast is mounted to the RMPS and is designed to support the AIRS antenna, lighting protection system, and _____.
Two aircraft warning beacons.
What does the Black Router do in the IFCN?
Prioritizes traffic and decides the traffic route between comm nodes.
User "Operator" have only _____ privileges and is not capable of making changes.
Read/View
Which software application allows users to add workspaces to the Linux desktop?
Workspace Switcher
The key feature and primary assembly of the EOC is a common plug-and-play suite of the electronics called the _____.
Mission Control Assembly
When confirming site requirements for optimal operation of the relay, check for a dry location, a level location with a slope of no more than 10 degrees, and a minimal clearing of ____ feet.
18 Feet
The Service, Maintenance, Repair and Recoverability (SMR) consist of _____ codes.
(how many codes)
5 Codes
After recording ____ hours of data without being stopped, the DCP will continue to record of the oldest data, thus, re-writing and resulting in data loss.
96 Hours