Sheet or Tubing that we bring in weekly or biweekly are examples of this type of material.
What is High-Volume?
_____ is the cost of this material.
What is $1.28?
We try to compile at least this many quotes from different vendors?
What is 3?
Heat certifications provided by the vendor verify this.
What is the composition or chemical makeup of a material?
The category is "Negotiation".
Players - place your wagers.
Host - hit continue, without awarding any points
Custom items such as MORryde stickers or parts that are engineered to our specs are examples of this type of material.
What is Specialty?
_____ is the preferred vendor for this material.
What is Transtech?
Although price and service are important factors to consider when choosing a vendor, the most important factor is this.
What is Quality?
If a bad part is produced in house and cannot be cleaned up or repaired, it requires a Remake. If it can be cleaned up or repaired, it is called this.
What is a Rework?
Other than when sourcing a new part, what is another reason we may try to negotiate better pricing with our current vendor?
(4 potential answers)
1. We expect to order larger quantities.
2. They are increasing the price.
3. Another vendor came in with a lower quote.
4. We know that commodity pricing has come down.
Items that are used in production but are not actually part of the manufactured product are considered this type of material.
What are Supplies or Consumables?
_____ is the MOQ (minimum order quantity) for this material.
What is 5,000?
Prospective vendors are asked to supply samples, which are then approved by this MORryde team.
What is Engineering?
If it is determined that a vendor is at fault for a quality issue, we communicate to them by means of this.
What is an RMA or Return Material Authorization?