100

What are the available secondary voltages on and URD 1500kva transformer?

277/480v - GH806

100

What size crossarm is issued with a side-by-side double circuit?

12' 6 position arm per EK401

100

What are the minimum engineering charges? 

Schedule 300 12R.1, $200

100

# of conduits, bends, length and size of 1ph 400a multi-family panel.

2 conduits, 270 degrees of bend, 150' of length, 3" conduit.  ESR table 14

100

On what screen do you OrderBom a job?

RSST

200

What rating (in kV) of arrestor would be used on a 1ph 7.2kV URD line?

10kV -DQ201

200

Which has the higher ampacity, #6CU or #4ACSR?

#4ACSR = 105a, #6CU = 100a - EC051 table 3

200

How long is the MFC on a MESA contract in UTAH?

As long as service is taken but no longer than 15 years. 3 (b) (2) rule 12

200

What is the maximum allowable slope of any equipment base?

Bonus: where is it measured from/to?

2% - policy 242, 5.5


edge to edge

200

What are 2 common closing errors in RCMS?

"Con before Bom" - invoice prior to orderbom

Unspread conductor


300

What are the 5 main layers of an underground JCN 15kv URD cable?

1. Conductor

2. Conductor shield

3. Insulation

4. Concentric neutral

5. Outer jacket

GB011 Figure 1

300

What are the 4 standard sizes of overhead quadraplex?

#4, #2, 1/0 & 4/0

es101

300

what percentage of a customer's load must be irrigation for them to be on a rate 10 schedule?

90%, Rate 10

300

Who is responsible for providing the service conductor on underground temp jobs?

The customer, ESR 6.2.2 #3

300

What does BIL stand for?

Basic Impulse Insulation Level - DQ001

500

What is the recommended conduit size for 3ph 25kV 1/0 URD cable?

6" - GC011 table 2

500

How many tap positions are on a regulator and how much do they change voltage per position?

bonus how many regulator banks allowed per distro circuit? +100 point

32 steps total, 16 up for 10%, 16 down for 10%, 5/8% per step 

bonus: 3, 1 in sub, 2 on the line


500

What 4 circumstances would make an MFC indefinite in Utah?

Rule 12 5 (c) (d) (e) & (f)

1. duplicate service facilities

2. emergency service

3. highly fluctuating load

4. non-residential remote loads in isolated locations

500

At what distance from a curbed roadway would a padmounted facility require barrier posts?



under 1.5' - policy 242, 5.6

500

What does the order type ERR1 denote?

Joint Use - RCMS Order/Project type job aid

1000

What are the dimensions of the blockout on a 7'x12' vault lid for a PME-9 switchgear?

60"x34"

1000

What conditions must exist for ferroresonance to occur?

DA211

1. 1 or more primary phases open

2. less than 5% rated load on the transformer

3. system grounded at the source with no ground at the transformer bank

4. Primary circuit capacitive reactance and transformer reactance are equal or nearly equal.


1000

What is the proportionate share formula for a network upgrade?

Rule 12 3(c)(2)

(A+B)xC

A= (shared footage x average cost per foot) 

B= Cost of other shared distro equipment (if applicable)

C= (New additional connected load/Total connected load)

1000

What size rebar should be used in a poured in place 3ph transformer flat pad?

 #4 bar, Policy 242, 7.1.2

1000

what is the naming convention for an RCMS job to replace a deteriorated fibercrete pad?

FPI(A or B)-FC + circuit + description + facility point #

M