GAM
Encumbrance
Implementation
Closeout/Reimbursement
Contracting
100

GAM stands for

What is Grants Administration Manual?

100

Cost share project funds need to be approved/encumbered before this can happen

What is before installation/construction begins?

100

This is performed on-site by WCD during and after project installation

What is project inspection/as-built?

100

Reimbursement document signed by landowner, technical assistance provider, and District Manager

What is project voucher?

100

Two types of cost share contracts

What is percentage based and flat rate?

200

In addition to general State Cost Share procedures, each BWSR grant has to follow an associated document called

What is Grant Program Policy?

200

Two items needed for board packet at encumbrance

What is encumbrance memo and signed contract?

200

Document required for each cost share project to ensure successful implementation over project lifespan

What is Operation and Maintenance Plan?

200

Internal list that outlines all steps and documents we should have completed for each cost share project at closeout

What is project closeout checklist?

200

Required document when changes need to be made to original cost share contract

What is contract amendment?

300

Bother these two people if you can't find something in the GAM

Who is grant lead or Board Conservationist?

300

Cost share projects need to be ranked by this group

What is Cost Share Subcommittee?

300

Type of meeting held before project installation, with the landowner, contractor (if applicable), and WCD staff

What is pre-construction meeting?

300

Three items sent to a landowner after payment approval

What is payment letter, executed project voucher, and check?

300

Landowner's time on project install can count as 

What is match?

400

Minimum number of years cost share project files need to be kept beyond life expectancy of installed practice

What is six?

400

Two items sent to landowner after cost share project approved/encumbered

What is project approval letter and executed contract?

400

Party responsible for necessary repairs if a cost share project fails prior to minimum practice lifespan

Who is the landowner/applicant?

400

Grant manager should update these three grant/project platforms at closeout

What is grant log, eLINK, and BMP database?

400

Required document when multiple landowners are involved in one cost share project

What is group project addendum?

500

The WCD follows State Cost Share procedures for these types of grants

What is ALL WCD grants?

500

Number of quotes the WCD requests landowners obtain for cost share projects

What is two?

500

The reason Angela will need assistance overseeing project installations July-September 2024

What is maternity leave?

500

Four types of information required on invoices or receipts

What is vendor name, materials, component unit costs, and date work performed?

500

Five amendment types to an original cost share contract

What is date, amount, land occupier, practice, or other?