100

Which of the following is part of lift planning?

 a. Compilation of a list of needed equipment

 b. Consideration of the overall operation

 c. Evaluation of the difficulty of the lift

 d. Evaluation of the skill levels of the personnel involved 

 e. All are part of lift planning

e. All are part of lift planning

100

Lift planners should be   ?  .



 a. a contractor

 b. a crane operator

 c. a qualified person

 d. a rigger

 e. only a qualified engineer 

c. a qualified person

100

What is needed if a site has obstructions that block the operator’s view?

 a. On site Safety

 b. Signalperson

 c. Spotter

 d. Supervisor 

 b. Signalperson

100

The rated load is the   ?   that a rigging component may be subjected to while maintaining an appropriate margin of safety.

 a. breaking strength

 b. maximum tension

 c. safety factor

 d. ultimate strength 

 b. maximum tension

100

All rigging equipment should be   ?   before being stored.

 a. clean and dry

 b. coiled

 c. oiled or lubed

 d. tagged 

 a. clean and dry

200

OSHA Section 29 CFR 1926 apply to   ?  , respectively, and are the most widely referenced workplace safety standards. 

a. agriculture

b. construction

c. general industry

d. maritime 

b. construction

200

A civil engineer would be called upon to evaluate which of the following?

 a. If additional blocking, matting, or other support is needed

 b. If the ground has sufficient load bearing capacity

 c. Both a. and b.

 d. None of the above, civil engineers are not qualified to determine issues related to cranes and lifting. 

c. Both a. and b.

200

Whenever nonstandard signals are necessary, who must agree on the new signals before using them?

 a. Operator and Signalperson

 b. Operator and Supervisor

 c. Signalperson and On-site safety

 d. Supervisor only 

 a. Operator and Signalperson

200


What hitch is typically the most stable way to rig a load for hoisting?

 a. Basket

 b. Bridle

 c. Choker

 d. Vertical 

 b. Bridle

200


The minimum recommendation information on an inspection document includes the serial number,   ?   attachments, condition notations for each component, and whether the component must be removed from service.

 a. manufacturer

 b. rated load

 c. size

 d. all of the above

 d. all of the above

300

A(n)   ?   person, according to OSHA, is “one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training or experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work or the project.” 

a. authorized

 b. certified

 c. competent

 d. qualified 

d. qualified

300

A fall zone should be   ?   as the load is hoisted higher.

 a. equal to the size of the load
 b. larger
 c. smaller
 d. the same as a load lifted near the ground


b. larger

300


Nonstandard signals are permitted only if   ?  .

 a. standard signals are practical

 b. when only the operator wants to use them

 c. when the signalperson is new to the job

 d. when the standard signals are impractical 

 d. when the standard signals are impractical

300


The most precise way to calculate the tension on a sling involves   ?  .

 a. a load triangle

 b. a vertical hitch

 c. using angles less than 90 degrees

 d. using angles more than 90 degrees 

 a. a load triangle

300


A   ?   hook is a sliding hook used to form a choker sling when hooked to a sling eye.

 a. choker

 b. foundry

 c. grab

 d. hoist 

 a. choker

400

Certification for rigging and hoisting typically requires passing both a written exam and a(n)   ?  .

a. aptitude test

 b. background check

 c. CDL physical

 d. practical skills test 



d. practical skills test

400

A(n)   ?   is a “dry run” of an actual lift that often exposes additional issues that must be addressed before the actual lift.

 a. analysis
 b. examination
 c. inspection
 d. pre-lift check


d. pre-lift check

400


How much do 100 pieces of 20' lengths of 2" x 2" steel pieces weigh?

Given: Steel is 490 lb/ft3 or 0.284 lb/in3

 a. 272.64 lbs.

 b. 3,000.5 lbs.

 c. 9,600 lbs.

 d. 27,264 lbs. 

 d. 27,264 lbs.

400


By using the smaller angle on a sling load chart, what is a benefit of doing so?

 a. Decreased safety factor

 b. Increased safety factor

 c. No benefit

 d. No safety factor 

 b. Increased safety factor

400

  ?   eyebolts have a shoulder and a fully threaded shank.

 a. Formed

 b. Machinery

 c. Ring

 d. Shoulder nut 

 b. Machinery

500

  ?   cranes are permanently installed and are intended for long-term use. 

a. Fixed

 b. Jib

 c. Mobile

 d. Truck 

a. Fixed

500

The signalperson may even wear   ?   in order to improve communication and ensure that no other person is mistaken as the designated signalperson.

 a. easily visible clothing

 b. hi viz vest

 c. yellow hard hat

 d. all of the above 

d. all of the above

500

Using the   ?   procedure involves considering the load as a group of smaller sections, each with its own weight and CG.

 a. balance

 b. lift point

 c. moments

 d. section CG 

 d. section CG

500

Some equipment inspections may require the use of   ?   to determine whether the equipment remains within allowable specifications.

 a. a mechanical engineer

 b. cleaning equipment

 c. measuring tools

 d. recordkeeping 

 c. measuring tools

500

Which of the following is not a sign of damage that requires removal from service?

 a. Inoperable latch mechanisms

 b. Missing paint or coating

 c. Reduction in any specified dimension of 10% or more

 d. Unreadable rated load information 

 b. Missing paint or coating