Installation Emergency Managment Plan
What are the 3 different backfill methods
Debris Backfill, Choke Ballast over Debris, Choke Ballast
How many gallons of water is used per super sack, and how much does a super sack weigh?
70 gallons of water, 3000lb super sack
What are the dimensions of the SSS?
32feet 6 inches x 20 feet x 12 feet
What are the 2 different types of Lagoons?
Oxidation and Evaporation
Who is in charge of the convoy brief
Crater Cheif
What is CPM
Crater Profile Measurement
What is RAP and what is the maximum rap size I can allow in the batch Plant?
Reclaimed Asphalt Pavement, 2 inches
what is the shelf life of the SSS?
20 years
The dike walls are built to allow __ to __ feet of liquid in the lagoon with an additional ____ feet of the wall above the liquid.
2 to 5 feet, 3 feet of additional
Who is the facilitator between chiefs and CE-UCC
RADR OIC
What are the different FOD Covers, (full name)
AM-2 Matting, Fiber Reinforced Polymer (FRP) Matting
How far is the COOKIE/ RAP stock pile from the Ready Hot Mix Asphalt stock pile?
60 feet
when would you use guy ropes, and how far are the D ring spikes from SSS?
When wind speeds are 40 MPH, 36 inches away
What is in an oxidation Lagoon to help break waste down.
Microbials
What is RQC
Repair Quality Criteria
How big is the AM-2 Matting fully assembled, which side gets anchored?
77.5 x 54 54ft side
The recyclers intended use is recycling cold asphalt mix (fines, milling asphalt), and broken slabs up to what dimensions?
11.8 inches x 15.75 inches x 4 inches
what is the measurement for squaring up the base frame for the SSS?
38 feet 3 inches
what are the 4 different types of revetments? Describe each.
Bitburg- L shaped, 6 feet and 13 feet tall
Bremer- T shaped, 12 feet tall
Concrete bins- must be filled with dry material, can be stacked by using a crane.
Expandable Bin revetments- Baskets that are hinged galvanized wire panels lined with a geo-fiber fabric liner.
what are the 4 types of repair Methods (name the initial ones first) in order
Rapid, Expedient, Sustainment(operational), Permanent
what are the 4 different sizes of FRP?
Full size Panel- 18 feet x 6 feet 8 inches
Half size panel- 9 feet 4 inches x 6 feet 8 inches
Full size anchor panel- 18 feet x 2 feet
Half size anchor panel- 9 feet 4 inches x 2 feet
Where can I use RAP and what percentage of asphalt binder does not exceed of the total asphalt content?
Shoulders and 20%
What are you going to reference to when assembling a SSS?
The Manufacture's Operator Manual, T.O. 35E5-6-11
What is the 4th step in soil cement road construction?
Use a cultivator, plow, or rotary tiller to loosen the soil. Loosen it to a sufficient depth so when the material is compacted, it will produce the required density.