RADR
ADR
RDR
SSS
CONT. CONSTRUCTION
100
What is IEMP

Installation Emergency Managment Plan

100

What are the 3 different backfill methods

Debris Backfill, Choke Ballast over Debris, Choke Ballast

100

How many gallons of water is used per super sack, and how much does a super sack weigh?

70 gallons of water, 3000lb super sack

100

What are the dimensions of the SSS?

32feet 6 inches x 20 feet x 12 feet

100

What are the 2 different types of Lagoons? 

Oxidation and Evaporation

200

Who is in charge of the convoy brief

Crater Cheif

200

What is CPM

Crater Profile Measurement 

200

What is RAP and what is the maximum rap size I can allow in the batch Plant?

Reclaimed Asphalt Pavement, 2 inches

200

what is the shelf life of the SSS? 

20 years

200

The dike walls are built to allow __ to __ feet of liquid in the lagoon with an additional ____ feet of the wall above the liquid. 

2 to 5 feet, 3 feet of additional

300

Who is the facilitator between chiefs and CE-UCC

RADR OIC

300

What are the different FOD Covers, (full name)

AM-2 Matting, Fiber Reinforced Polymer (FRP) Matting

300

How far is the COOKIE/ RAP stock pile from the Ready Hot Mix Asphalt stock pile?

60 feet

300

when would you use guy ropes, and how far are the D ring spikes from SSS?

When wind speeds are 40 MPH, 36 inches away

300

What is in an oxidation Lagoon to help break waste down.

  Microbials

400

What is RQC

Repair Quality Criteria

400

How big is the AM-2 Matting fully assembled, which side gets anchored?

77.5 x 54          54ft side

400

The recyclers intended use is recycling cold asphalt mix (fines, milling asphalt), and broken slabs up to what dimensions?

11.8 inches x 15.75 inches x 4 inches

400

what is the measurement for squaring up the base frame for the SSS?

38 feet 3 inches

400

what are the 4 different types of revetments? Describe each.

Bitburg- L shaped, 6 feet and 13 feet tall

Bremer- T shaped, 12 feet tall

Concrete bins- must be filled with dry material, can be stacked by using a crane.

Expandable Bin revetments- Baskets that are hinged galvanized wire panels lined with a geo-fiber fabric liner.

500

what are the 4 types of repair Methods (name the initial ones first) in order

Rapid, Expedient, Sustainment(operational), Permanent 

500

what are the 4 different sizes of FRP?

Full size Panel- 18 feet x 6 feet 8 inches

Half size panel- 9 feet 4 inches x 6 feet 8 inches  

Full size anchor panel- 18 feet x 2 feet

Half size anchor panel- 9 feet 4 inches x 2 feet

500

Where can I use RAP and what percentage of asphalt binder does not exceed of the total asphalt content?

Shoulders and 20%

500

What are you going to reference to when assembling a SSS?

The Manufacture's Operator Manual, T.O. 35E5-6-11 

500

What is the 4th step in soil cement road construction?

Use a cultivator, plow, or rotary tiller to loosen the soil. Loosen it to a sufficient depth so when the material is compacted, it will produce the required density.

M
e
n
u