LNEWs
Security Lights
MVINs/MVOTs
Issues
Requests
100

The icon to create a new one of these is a map pin with a wrench.

What is a Location?

100

The only type of light that Versant Power is installing going forward.

What are LED lights?

100

The descriptor that must be added to your order notes when setting a MVIN for a location where there will be no interruption in service.

What is a changeover?

100

These are set when the customer is looking to make a change where Planner involvement is needed, such as installing a generator or moving the service entrance.

What is a LINE issue?

100

The request used after a meter float.

What is an MRAT (reattach meter)?

200

How long can a location be without service before it requires an LNEW instead of a standard MVIN?

What is 12 months/1 year?

200

The node where a SLINS issue is set.

What is the Location node?

200

Customers must be advised to turn these off for safety purposes when we are connecting or disconnecting service.

What are breakers?

200

You'll set this issue when a customer would like coverage on their private line.

What is PLUS (a Private Line Utility Support inspection)?

200

Set this request for a customer who needs to have a section of line less than 10 feet wrapped.

What is an LHSE (line hose) request?

300

This city is the exception to the LNEW rule for existing services.  They require a city inspection prior to new service after 90 days.

What is Bangor?

300

The date a light changeover has to be set and resolved.

What is the day the customer wishes to take over service?
300
When a new customer requests a changeover, one of these will be sent to the previous/existing customer.

What is a final bill?

300

This issue is set for a customer who would like their security light repositioned.

What is a SLUPG (security light upgrade)?

300

Private line customers hiring an arborist need one of these set so the work can be done safely.

What is a PLDS (disconnect at pole)?

400

This person makes a site visit to determine what is needed for connection and signs off on the final inspection prior to service being connected.

What is a Service Planner?

400

The CU acronym for a seasonal light.

What is PLITE?

400

These are set for surviving spouses who request to be responsible for service.

What is a backdated MVIN?

400

This is created when a CSR responds "Yes" to the question on a LINE issue workflow asking if there is an emergency.

What is an EMGEC?

400

This request sends a Meter Service Worker to a location where an electrician has cut the seal to access the meter.

What is an MSEL (meter reseal)?

500

These employees handle paperwork requests associated with an LNEW and work with the customer during the service order process.

Who are Customer Coordinators?

500

The three types of security lights Versant Power has in the field.

What are high-pressure sodium, mercury vapor, and LED lights?

500

This is who CSRs contact to request a same day MVIN.

What is the Credit Group?

500

Where issues and requests are set for a location that is not in CU.  (Example: An NOR location that last had service prior to using CU but the customer needs the line removed.)

What are the generic locations?

500

The request set to confirm a rate change from Residential to Non-Residential and vice versa.

What is an M/RD (meter read)?

M
e
n
u