AIRPLANE KNOWLEDGE
REASON CODE
STO
CCV
ENGINEERING
100

THE Z IN ZMD 411A3160-1 IS AN INDICATOR THIS MOLD DIE IS USED BY WHAT BUSINESS UNIT?

INTERIORS (FAB DIVISION)

100

TRUE OR FALSE.  SAFETY ORDERS SHOULD HAVE A RC 41 AND AN ALPHA DESIGNATOR TO SIGNIFY IMPORTANCE OF THE ISSUE?

FALSE

100

HOW LONG SHOULD AN STO STAY OPEN IN SFM?

1 YEAR

100

FOR A RC 12 DO, WHAT WOULD YOU EXPECT TO SEE FOR THE CCV-REASON

DTR # FROM PPCR+

100

WHAT REASON CODE WOULD BE USED ON A DESIGN ORDER TO CANCEL THE TOOL DRAWING?

RC 56

200

FAJ 112W0000-1 BELONGS TO WHAT PROGRAM?

777

200

WHAT REASON CODE IS AN STO MFG ORDER?

RC 56

200

*** DAILY DOUBLE ***

AN STO CANNOT BE USED IF THE STATEMENT OF WORK IS MORE THAN THIS MANY HOURS?

200

FOR A RC 41 DO, WHAT WOULD YOU EXPECT TO SEE FOR THE CCV-REASON?

ENABLON

200

WHICH REASON CODE BELOW SHOULD NOT BE FOUND ON A DO TO REVISE A DESIGN

RC31    RC 36    RC41    RC 42

RC 31

300

KC46A PEGASUS IS BASED ON WHAT COMMERICAL AIRPLANE

767-2C

300

CAN AN ADDITIONAL UNIT OF AN EXISTING TOOL BE ORDERED IF IT IS NOT NEEDED TO SUPPORT THE PRODUCTION RATE?

YES

300

YES OR NO.  IF I NEED TO ORDER A PART FROM A TOOLING SUPPLIER LIKE WOODLAND OR VALIANT, CAN I USE AN STO?

NO

300

FOR A RC 42 DO, WHAT WOULD YOU EXPECT TO SEE FOR THE CCV-REASON?

TOOL REQUEST

300

WHAT ARE AS LEAST 2 DO REASON CODES THAT SHOULD HAVE A LINE NUMBER CALLED OUT IN THE EFFECTIVTY FIELD?

12, 10, 15, 17, 31, 36

400

*** DAILY DOUBLE ***

WHERE DOES 787 FINAL ASSEMBLY TAKE PLACE?

400

IF A DO COMES IN WITH A NOCOM/IMP EFFECTIVTY, WHAT RC WOULD YOU EXPECT TO SEE IN THE TOOL CUSTOM FIELDS?

RC 42

400

TRUE OR FALSE.  STO CAN BE USED TO ORDER RAW MATERIAL

FALSE

400

WHAT REASON CODE AND EFFECTIVTY WOULD YOU EXPECT TO SEE FOR AN SDR?

RC 90, NOCOM/SDR

400

WHEN AN ACTIVE TOOL HAS A NON CONFORMANCE ATTACHED TO IT, TOOL ENGINEERING USES CRA FOR THE TOOL TO BE CONTINUED TO BE USED UNTIL IT IS FIXED.  WHAT DOES CRA STAND FOR?

CONDITIONAL RELEASE AUTHORIZATION

500

WHO IS THE CURRENT EVERETT SITE LEADER? (VPGM)

JASON CLARK

500

ALL DO'S REQUIRE A FULL RCRM EXCEPT FOR THESE TWO REASON CODES?

12 AND 42

500

YES OR NO.  IF A TOOL MAKER WANTS TO RIDE HIS BIKE TO THE 40-04 SHOP,  SHOULD HE CLOCK IN ON THE STO TO INSURE HIS LABOR IS COLLECTED?

NO

500

WHAT REASON CODE AND EFFFECTIVTY WOULD YOU EXPECT FOR AN IRTI?

RC 56 CUSTOMER #/LINE #

500

UNDER WHAT CIRCUMSTANCE IS A RC 36 USED ON A DESIGN ORDER?

ENGINEERING CHANGE ON AN EXISTING TOOL

M
e
n
u