Semiconductor Basics
Pilot Build & Assembly
Tool Testing & Troubleshooting
Safety & Procedures
Teamwork & Communication
100

This element is the primary material used in semiconductor wafers

What is silicon?

100

This term refers to the first unit built to validate design and process.

What is an alpha / first article build?

100

This is the first action when a tool fails a test.

What is document the issue and notify engineering?

100

These items must be worn in the cleanroom to prevent contamination and maintain safety.

What is PPE (gown, gloves, mask, glasses, booties)?

100

This person should be contacted for clarification on build instructions.

Who is the Manufacturing Engineer or Lead Technician?

200

This process removes material to create patterns on the wafer.

What is etching?

200

This document provides step-by-step instructions for assembling tools.

What are Manufacturing Work Instructions (MWI), Work instructions, OMS, SOE, procedure?

200

This type of test verifies tool functionality without using wafers.

What is a dry run / simulation mode?

200

This acronym stands for a safety procedure to isolate energy sources and Accidental machine startup.

What is LOTO (Lockout/Tagout)?

200

This daily meeting reviews goals, issues, and updates.

What is a Tier Meeting, daily status meeting, daily 8 AM meeting?

300

This controlled environment minimizes contamination during wafer processing.

What is a cleanroom?

300

This issue often causes delays in pilot builds due to late updates.

What are engineering changes?

300

This test ensures vacuum integrity and prevents contamination.

What is a leak check?

300

This feature prevents unsafe operation of a tool.

What is a safety interlock?

300

This tool helps track and resolve build issues.

What is a build tracker/ ESR/ QB / JIRA / PMPM?

400

This chamber enables plasma processes by maintaining low pressure.

What is a vacuum chamber?

400

This markup on a drawing indicates corrections or changes during a build.

What is a redline?

400

This device measures vacuum pressure inside a chamber.

What is a vacuum gauge/ manometer ?

400

This is the first action when discovering a chemical leak.

What is evacuate and report the incident?

400

This lean practice involves walking the shop floor to observe processes.

What is a Gemba/ RMBWA walk?

500

This energized state of gas is used in dry etch tools to modify wafer surfaces.

What is plasma?

500

This temporary approval allows deviation from standard build procedures.

What is a build deviation / deviation waiver/ deviation request approval ?

500

What is a common reason for failing a wafer transfer test?

What is Misaligned robot arm / faulty sensors / teaching issue

500

What’s the term for identifying potential hazards before they happen?

What is Risk Assessment

500

This type of communication ensures alignment between engineering and manufacturing.

What is cross-functional communication, CFT meeting?

M