Miscellaneous
Abbreviations
Virtual Design & Construction
Sustainability
Scheduling
100

Tallest building in the world

Burj Khalifa

100

PPE

Personal Protective Equipment

100

This term describes identifying and resolving design conflicts before construction begins

Clash Detection

100

This green certification system rates buildings based on sustainability and energy efficiency

LEED

100

Snapshot of the initial, approved project timeline

Baseline

200

A metal bar that is used to help increase the tensile strength of concrete

Rebar

200

MEPFP

Mechanical, Electrical, Plumbing, Fire Protection

200

This VDC-driven process ensures that different trades, such as plumbing, electrical, and HVAC, work together smoothly on-site to avoid conflicts during installation

Field Coordination

200

Term for water that is safe to drink

Potable

200

Longest sequence of dependent tasks that must be completed on time to finish the project by the earliest possible deadline

Critical Path

300

According to Jordan, what is the most important thing in a contract

Scope

300

RFI

Request for Information

300

VDC helps construction teams identify issues in the design phase, where fixing problems early helps save these two valuable resources

Time and Money

300

Property, typically industrial or commercial, that is abandoned and potentially contaminated due to past uses

Brownfield

300

Amount of time an activity can be delayed without impacting the project's overall completion date or the start date of a subsequent activity

Float

400

Forces that produce movement or change

Dynamics

400

HWS / HWR

Hot Water Supply / Hot /Water Return

400

Who presented the Virtual Design and Construction session

Edwin

400

This durable and renewable material is gaining popularity as a low-carbon alternative to steel and concrete structures

Mass Timber

400

Term for teams working backward from a desired end date to identify and sequence tasks.

Pull Planning

500

Secondary route for transferring loads in a building or structure when the primary load path is compromised

Alternative Load Path

500

PTP

Pre - Task Plan

500

This software is widely used for creating BIM models and allows users to design, document, and coordinate building components in 3D

Revit

500

This term refers to the total greenhouse gas emissions from materials over their life cycle, from extraction to disposal

Embodied Carbon

500

Visual project management tool that displays a project's schedule as a series of horizontal bars

Gantt Chart