Maintenance and Operations
Utilites
ROW
Hydro
100

The Fairbanks M&O superintendent.

Who is Ron Davis?

100

This road currently does not have any relocation benefits.    

Is it the Dalton Highway?

100

The term for an unpermitted structure or object present in our ROW.      

What is encroachment?
100

Hydro designs all culverts that are this diameter or larger


What is 48 inches?

200

This type of guardrail is easiest/best for snow removal.

What is Box Beam?

200

Most Alaskan utility permits grant this type of permanent benefits.

Is it relocation benefits?

200

Type of easement that is required for work that will leave minor but permanent improvements outside of our ROW.

What is a TCE?
200

This is the absolute minimum depth of cover for most culverts.


What is 12 inches?

300

Northern Region M&O has this many active maintenance stations.

Is it 37?

300

The minimum clearance for NEW overhead utilities. 

Is it 20 ft?

300

Incentives  for acquisition will be held open for

What is 90 days from the date the initial offer was made?

300

Measures the absorption of surface water into the ground.                          

What is infiltration?

400

Northern Region M&O is split into this many districts. 

Is it 7?

400

Utilities will have relocation benefits and are grandfathered in if they were placed/installed before.

What is 1964?

400

 The right of the government to take (acquire) private property for a public purpose upon the payment of just compensation.


What is eminent domain?

400

Roy has a new toy!


What is culvert crawler?

M
e
n
u