Arena Energy was founded this year.
What is 1999?
This SEMS element provides the mechanism for evaluating any “Not In Kind” change before it is implemented.
What is Management of Change (MOC)?
REM Bulletin 010: This is the required frequency for replacing the cartridge in a Van Air Dryer system.
What is semi-annually?
Conducting Hot Work SWP: Fire Watch personnel must remain on duty for at least this long after welding or burning hot work has stopped.
What is 30 minutes?
This valve is required in flowing wells and is designed to shut in the well below the surface in the event of an emergency.
What is a Surface-Controlled Subsurface Safety Valve (SCSSV/SSSV)?
According to Arena's future vision, the company is committed to this region and has more than 10 years of drilling inventory remaining.
What is the Gulf of America Shelf?
This person has Ultimate Work Authority (UWA) for an active production facility.
Who is the PIC?
REM Bulletin 002: After noticing a leak on a line in the vicinity of a turbo during routine rounds, this is the immediate action that should be taken.
What is shut down the unit immediately and contact your field mechanic?
Crane Lifting & Rigging SWP: Any person can give this signal, and the crane operator must obey it immediately.
What is the Emergency Stop signal?
This system must be capable of shutting down production equipment and isolating hydrocarbon flow when an abnormal condition is detected.
What is the Emergency Shutdown (ESD) System?
This Arena company was founded in 2002 and serves as the operator for Arena Energy's Gulf of America assets.
What is Arena Offshore?
Any worker who believes an imminent risk or danger exists has the authority to exercise this right.
What is Stop Work Authority (SWA)?
REM Bulletin 017: If compressor operating conditions need to be changed outside the limits shown on the yellow placard, approval must first be obtained from this person.
Who is the Rotating Equipment Specialist?
Energy Isolation/LOTO SWP: If a LOTO permit remains active beyond this length of time without approval for extension, it must transition to Critical Device Position Control.
What is 30 days?
These devices on pressure vessels must be tested annually to ensure they activate at the proper pressure.
What are Pressure Safety Valves (PSVs)?
This Arena company was formed in 2020 to provide abandonment services and environmental remediation.
What is White Fleet Abandonment?
This online system is used by Arena to verify contractor training compliance before personnel travel offshore.
What is ISNetworld (ISN)?
REM Bulletin 013: These electrical components must be replaced anytime an air compressor motor is replaced.
What are the contacts and overloads?
Working from Heights SWP: Personnel working from heights must maintain this level of tie-off protection whenever repositioning, climbing, descending, or working at elevations of 6 feet or greater.
What is 100% tie-off?
This device automatically closes at the wellhead upon loss of control pressure to help prevent an uncontrolled release.
What is a Surface Safety Valve (SSV)?
This Arena-affiliated midstream company was formed in 2017 and plays a critical role in moving crude oil from some of the Gulf Shelf's most active assets.
What is Rosefield Pipeline Company?
This hazard assessment process requires the work team to identify job steps, associated hazards, required PPE, and control measures before starting non-routine work.
What is a Job Safety Analysis (JSA)?
REM Bulletin 012: Operators can use this instrument to verify that an engine is running when a run-engine light is not visible.
What is a Hertz gauge?
OOS, Bypassing & Monitoring Equipment SWP: These are the only three reasons a safety device may be temporarily bypassed.
What are startup, maintenance, and testing?
If a heater treater fire tube becomes uncovered due to low liquid level, this sensor should shut off the fuel supply.
What is a Level Safety Low (LSL)?