The number of NOLA Red Light Behaviors
5
Leadership and Commitment
MERT
Medical Emergency Response Team
This Hose Team member takes charge of the team's response efforts and assigns other Hose Team members to their postion
Incident Commander
This Safety Right to Run standard ensures we have completed all scheduled inspections and maintenance before the end of each month
100% HS&E Inspections/PMs completed monthly
This RLB ensures that equipment is de-energized before you remove machine guarding
Lockout/Tagout
Campus owner of the Lock out/Tag out KE
Mike Landry
MCA
Multi-Cause Analysis
If the handheld scanner for taking headcount during an evacuation is not working or no one on your team knows how to use it, you should use this back-up system
Paper headcount sheets
This tool must be used whenever we want to knowingly deviate from a Right to Run standard
Risk Assessment
The most recently introduced "all-new" Red Light Behavior
Fall Prevention and Protection
This KE owner team meets every Friday
Change Control
PDCA
Plan, Do, Check, Act
If you are not MERT-qualified and you are first on the scene of an injury, you should do this
Use the PA or radio to call for MERT
This checklist in the Process departments ensures we are safe to resume operations after a roaster or grinder fire
After Fire Start-Up Checklist
In order to avoid a Red Light Behavior, this step is required of safety permit authorizers before signing a permit
Verifying field conditions match permit requirements
The responsibility for this KE which ensures chemical safety is shared between HS&E and QA
Chemical Management
SDS
Safety Data Sheet
A monthly safety PM ensures that these are always in working order to allow for safe egress in the event of a power outage
Emergency lights and exit signs
These specialty safety skills must be verified at the start of every shift
1 MERT + 5 (Chef)/6 (Gentilly) Hose Team
The one exception to having to get permission to cross a red safety barricade each and every time you cross the barricade
Fire watches during the fire watch period
This KE recently had "rigging" added to its scope of responsibilities
Material Handling
TWA
Time-Weighted Average
The primary/central weathering monitoring location at your plant
Gentilly - Utilities Control Room
or
Chef - QA Lab
This must be identified and countermeasures must be implemented after significant HS&E incidents in order to start-up
root cause