Uses non combustible materials
Type 1
RIT
Rapid intervention team
Name of the yellow ice rescue suit
Mustang
Anaphylaxis is considered what type of shock
Distributive
How to signal an evacuation with fire apparatus
Operators of all apparatus with air horns shall sound the horn with three two-second blasts every ten seconds for one-minute
continuous studs from the foundation to the roof
Balloon frame construction
CAN
Conditions-Actions-Needs
Water tank capacity of R3
750
What size ETT adapter fits our needle cric catheter
3.0
During the daily the minimum PSI of an SCBA tank should be.
4000 PSI
A short vertical wall used to support roof rafters or to create usable space in an attic with a sloping ceiling
Knee Wall
LUNAR
Location, unit number, name, assignment (or air supply status), resources needed
Orange top flow rate
500–999
What is the Parkland Burn formula
TBSA % x kg x 4 ml. Half over the first 8 hours.
Maximum response speed above posted speed limit
10 mph
This type of roof slopes on all sides
Hip
BLEVE
Boiling liquid expanding vapor explosion
Seimans and silent knight are two main company's of what
Fire Panels
What is the MAP for a BP of 80/40
53.3
The NIMS system identifies 5 major functions to be managed at any incident.
These include
1. Command
2. Operations
3. Planning
4. Logistics
5. Finance
a full-length vertical stud on either side of a framed opening (like a door or window) that runs from the top plate to the bottom plate of a wall
King Stud
RECEO-VS
Rescue Exposer confinement extinguishment overhaul ventilation salvage
R3 fuel tank capacity
35
Lisinopril is what class of drug
ACE Inhibitor
This occurs when heavy loads cause the floor to collapse at the center
V shape void