(Blank)
100

WHAT IS ORM?

IS A DECSISION MAKING TOOL USED BY IDENTIFING, ASSESSING, AND MANAGING RISK

200

WHAT ARE THE 4 PRINCIPALS OF ORM IN ODER?

1. ACCEPT RISK WHEN BENEFITS OUTWAY THE COST

2. ACCEPT NO UNNECESSARY RISK

3. ANTICIPATE AND MANAGE RISK BY PLANNING 

4. MAKE RISK DECISIONS AT THE RIGHT LEVEL 

300

WHAT ARE THE 5 STEPS OF ORM IN ODER?

1. IDENTIFY HAZARDS 

2. ASSESS HAZARDS 

3. MAKE RISK DECISIONS 

4. IMPEMENT CONTROLS 

5. SUPERVISE 

400

WHAT ARE THE 3 TYPES OF IMPLEMENT CONTROLS?

1. ENGINEERING CONTROLS 

2. ADMINISTRATIVE CONTROLS 

3. PPE 

500

EXPLAIN WHAT RISK ASSESSMENT CODE (RAC) IS  AND HOW WE USE IT

RAC IS A MATRIX TO DETERMINE THE LIKEIHOOD OF MISHAP.  THE LOWER THE NUMBER THE MORE LIKELY A MISHAP COULD OCCUR.

M
e
n
u