PSC
FAC
POLLUTION x2
POLLUTION
FACx2
100

Pre arrival and departure main steering gear tests must be conducted how long before entering or departing port

12 hours

100

QI notification exercises must be conducted how often?

Quarterly (154.1055(a)(1))

100

Up to how many jars can be packaged in a single box?

08 (MSL Guide/Oil Spill Transmittal Guide p.9)

100

One (1) high tide and one (1) low tide each day is called?

Diurnal Tide

100

Welding or hot work is prohibited within how many feet of hazardous materials on a 154 Facility?

50ft (15.25m) (154.735(l)(1))

200

A SOLAS Safety Construction Certificate is issued by whom

Class

200

A Facility Response Plan has to be in accordance with ____.

National contingency plan (33CFR154.1030(f))

200

What kind of booming is used to isolate oil, to control spreading, to concentrate the oil, and facilitate its recovery by skimmers?

Containment Boom (Exxon Mobil Oil Spill Response Field Manual p. 5-11)

200

The preferred method for delivery of a LOW is what?

Hand Delivery (MSM Vol. V, Part C, Ch. 2.C.2)

200

How often must a facility security exercise be conducted?

Once each calendar year not to exceed 18 months (105.220(c))

300

How long is a Letter of Compliance (COC) valid for

24 months

300

When is a transfer considered to begin?

When the PICs on the facility and vessel first meet and begin a DOI (156.120)

300

A large body of air formed in a climatic region that moves out of its source region and effects weather in neighboring areas?

Air Mass (American Practical Navigator)

300

If an NOV is not paid within how many days, the activity status is automatically updated to Open-Forwarded for Collections?

60 Days (NOV User Guide p.4-3)

300

A new vapor control system must be certified by whom?

Certifying Entity (154.804(a))

400

Which organization is responsible for the safety of vessel and pollution prevention?

MARPOL

400

Reception facilities must be able to complete the reception of oily mixtures within 4 hours after the transfer begins

4 Hours (33CFR158.200(a)(3)(iii))

400

Strike team must deploy within how many hours?

4 hours

400

What type of shoreline makes cleanup very difficult, possible only during low tides and the use of heavy machinery should be restricted to prevent mixing of oil into the sediments?

Exposed Tidal Flats (Shoreline Assessment Manual p. 95-96)

400

If a vessel is moored at the facility during a drill, the facility_____ require the vessel to participate in the drill.

CAN NOT (105.220(b)(3))

500

Who does IOPP form A apply to?

Ships other than oil tankers

500

Emergency shutdowns for facilities handling OIL? DATES & TIME

Before Nov 1, 1980 = 60 Seconds; 

After Nov 1, 1980 = 30 Seconds (154.550(c)(1-2))

500

NOVs for security violations that occur during MARSEC 2 shall be multiplied by how much?

1.5 x Proposed Amount  (NOV User Guide p.3-2)

500

Samples should be shipped in?

4oz Glass Jars (MSL Guide)

500

Alternative Security Programs (ASP) are approved by whom?

Commandant (101.120(b))