Pollution Prevention
Waste Management
Working over Water
Spill Prevention & Response
Misc.
100

Silt sacks are installed in catch basins to prevent this. 

What is sediment and debris discharged into storm drains and water ways. 

100

The platform used to coordinate waste to be sent to 357 the next day. 

POND Onsite moves 

100

This measures the impact of underwater noise on marine life in the river.

What is Hydroacoustics.

100

2 checks you should do on spill kits to ensure we are always ready for quick spill response. 

Accessible and fully stocked. 

100

The first names of the 4 EV team members for P381. 

Who are Paige, Chloe, Amanda and Sabrina.

200

The pH range of effluent water allowed to reinfiltrated while dewatering. 

What is pH 6.5-8.5

200

Lithium batteries are disposed of here. 

What is 357 Navy's Hazardous Waste Facility.

200

The distance that would require a shutdown if a seal was within the vicinity of noise generating work. 

What is 50 meters.

200

The first step when a spill occurs. 

What is stop at the source and contain. 

200

The rubber mats at the site entrance/exits are installed to mitigate this.

What is sediment trackout. 

300

The place high pH concrete process water must be pumped to. 

What is the Wastewater treatment system on B11 or HP.

300

The item disposed of in orange trash cans to go to 357. 

What are Aerosol cans.

300

Prior to noise generating in-water work, each day the mammal monitors must complete a pre-activity watch for this amount of time. 

What is 30 minutes. 

300

The amount of time 381 has to report a spill to the Navy's Fire Dept. 

What is 15 minutes

300

A permit that regulates discharges incidental to the normal operation of barge, like ballast water, bilge water, and gray water, to minimize environmental impact. 

What is a Vessel General Permit (VGP)

500

The visual indicators of contaminants while dewatering that would require corrective action. (Name atleast 3 - there are 6)

 What is a sheen, suspended solids, unusual color, presence of odor, decreased clarity, or presence of foam.

500

In order to send spoils to Waste Management, this form must be signed off on the week prior. 

What is a SWR (Site Waste Removal form) 

500

Cluster Drilling DTH, Impact Pile Driving, Hydraulic Rock Hammering , Hydraulic Rock Grinding and Mono-Hammering are all activities that require what for noise mitigation measure.

What is the Bubble Curtain.

500

The time(s)/ activitie(s) in which a team member must complete a DVI on equipment. 

When is daily before use and before your fly with a crane.  

500

The time interval environmental stormwater inspections are required to be completed. 

What is weekly and Pre/Post storm event of 0.5inches precipitation. 