Equipment designed to protect a worker against electrical contact, and/or electrical arc flash.
What is: Electrical Protective Equipment (EPE)
An employee who performs servicing or maintenance under the protection of a clearance.
What is: Authorized Employee
The location code of a work order that is in the field and can be worked.
What is a location code of 500?
A temporary endeavor undertaken to create a unique product, service or result and has approved funding.
What is a project?
A document containing the results of qualitative risk analysis, and risk response planning for a project.
What is risk register?
Isolated from all known sources of power.
What is: De-Energized
A clearance used by a single work discipline to perform maintenance.
What is: Single Owner Danger (SOD) Tag
Activity that Notes a significant point of development in a schedule
What is a Milestone
Craft personnel apply fundamental craft knowledge and skills gained through training and experience.
What is Craftmanship?
Any individual or organization who furnishes items or services in accordance with a procurement document.
What is a Supplier?
Shall be available to ensure each employee exposed to electric shock can be reached within four minutes
What is: CPR/First Aid
Any energy, including mechanical, pneumatic, hydraulic, electrical, chemical, nuclear, and thermal.
What is: Hazardous Energy
Longest path in a project schedule
What is critical path
A comprehensive collection of technical documents, permits, drawings, engineering/design documents, procedures and/or work instructions.
What is a Work Package?
Implement, Reference, Develop
What are Controlled Documents usage types.
Made from acetone, nylon, polyester, polypropylene, spandex or rayon fabrics.
What is: Non-Arc Rated (AR) clothing
Locks the Clearance in SWMS preventing any changes from being made to the Clearance.
What is: Admin Hold
Establishing initial system or equipment conditions, staging or installing required equipment, notifying or coordinating Support Services
What are Prerequisites?
A decomposition of all project work into manageable components supporting the project objectives.
What is Work Breakdown Structure (WBS)?
The key performance indicators.
Safety, Quality, Scope, Schedule, Cost
A shock protection boundary to be crossed by only qualified personnel at a distance from a live part which requires the use of shock protection techniques and equipment.
What is: Restricted Approach Boundary/Minimum Approach Distance (RAD/MAD)
Measures taken prior to the start of work to validate a clearance is effective in the isolation of the equipment to be worked on.
What is: Zero Energy Check
A graded approach to calculate project complexity which can be used to determine the correct level of oversight and control for a project
What is complexity model?
Examination or measurement to verify whether an item or activity conforms to specified requirements.
What is Inspection?
Gap of time after the completion of an activity and before the start of the next that is not critical path
What is free Float