Working days will be charged Monday–Friday
What is a Standard Workweek
ITEM 401
What is Flowable Backfill
Item for Asphalts, Oils, and Emulsions
What is ITEM 300
Control of Material
What is ITEM 6
Class C concrete use, 3 examples
What is Drilled shafts, bridge substructure, traffic rail, culverts except top slab of direct traffic culverts, headwalls, wing walls, inlets, manholes, traffic barrier
ITEM 421 Table 8
Remove the reclaimable asphalt material as shown on the plans or as directed. Ensure that of the reclaimed material passes a 2-in. sieve unless otherwise shown on the plans.
What is 95%
ITEM 305 ARTICLE 2
TRUE OR FALSE:
Working days will be charged if the performance of the principal unit of work underway, as determined by the Engineer, for a continuous period of at least 7 hrs.
What is TRUE
Recommended slump for drill shafts
What is 6 1/2
ITEM 416 Table 2
Apply binder material within of the selected temperature, but do not exceed the maximum allowable temperature.
What is 15 F
ITEM 310 4.3.1.
Reserves the right to make changes in the work, including addition, reduction, or elimination of quantities and alterations needed to complete the Contract.
What is the Engineer
ITEM 4 Article 4
The total creep movement is less than 0.04 in. during the final 10-min. reading increment. If movement exceeds this value, the Engineer may require an additional hold period of up to 60 min. with a maximum 0.08-in. total creep movement, including the movement from the original 10-min. hold.
What is Verification test for nail acceptance
ITEM 410 4.4.1.
ITEM 310 is measured in and paid
What is gallons
ITEM 310 ARTICLE 5
BMP
What is Best Management Practices
ITEM 1 ARTICLE 2
Use hand-operated or walk-behind compaction equipment in the wide strip adjacent to the wall panels.
What is 3 ft.
IEM 423 3.4
Small Quantity Dense Graded Hot Mix Asphalt
What is 5,000 TONS total production