LSWP Practices
63 Steps for Window Installations
The Men with Tools
Processes and Procedures
Misc
100

LSWP stands for this phrase

Lead Safe Work Practices

100

These are the first 5 steps to be taken on EVERY install

1. Introduce all team members to the homeowner

2. Review paperwork and work area with the customer and ask if there are any questions

3. Check ALL windows and materials are present

4. Remeasure ALL window openings PRIOR to taking the old unit out

5. Inspect all windows and materials for damage. 

100

These are the colors of The Men with Tools

Blue, Yellow, and White

100

This role designates installation, game plan and responsibilities for the daily installation

The crew lead

100

This frame type should be including in the measuring process and installation process of a basement hopper in cement

A buck frame

200

This is the material used to cover the immediate area in which products are being installed. 

3-4mil plastic sheeting

200

If there is a error on the sizing, damage to a unit, or discrepancy with what the homeowners expectations are, these are your next steps

1. Write all issues on the Installation Completion form

2. Take pictures and upload into CompanyCam

3. Call me ONLY if you need additional direction. NOT to tell me about it. I WONT REMEMBER IT. 

200

The 5 stages of The Installer Pipeline

1. Helper

2. Apprentice

3. Journeyman

4. Mechanic

5. Crew Lead

200

Our customers expect us to arrive between these hours

8 and 9am

200

These are the standard deductions taken on a window unit pocket install

Cant wait to hear these answers

300

Prior to this year, lead paint surfaces can be found in a home.

1978

300

These are the points in which shims should be placed.

Top, middle, and bottom on BOTH sides. 

300

These 3 people started the install team with John

Damian, Audi, Luan

300

When finishing a job and reviewing with the homeowner, there are 2 items to be reviewed

Final payment operation, of the windows while doing a full walk-through and speaking with Concierge

300

This product is required to be used in all pocket installs to insulate the unit

Spray foam
400

These 6 actions should followed for EVERY lead installation, when cleaning up.

Pick up all debris with wet clothes and place in a heavy duty garbage bag. 

Use a HEPA filtered vacuum to clean up the work area.

Wipe down work area using wet methods

Wipe down all tools and equipment

Roll plastic sheeting INWARD and place directly into heavy duty garbage bag

Clean area under drop clothes, using HEPA vacuum

400

This product is used to seal capping properly

Silicone products ONLY

400

Currently TMWT has 3 locations in these areas

Staten Island, NY, South Amboy, NJ and Summit, NJ

400

These are the 2 additional forms included in your installation packets 

The Lead Checklist Clean Up and the Installation Checklist Form

400

This process is used to make a entry door square level and plumb

Shims on 6 points

Leveling hinges hinges on slab

Leveling sill

500

This is the penalty amount, PER VIOLATION, for violating the RRP (Lead Renovation, Repair and Painting) rule. 

$37,500 per violation and each day a violation continues is considered a separate violation. 

500

This is the bend used to install capping into the exterior accessory groove.

A hem bend

500

This icon should be on all cell phones and be used at the completion of an install with the homeowner

The review link

500

These products, NO MATTER WHAT, are a full frame measure and installation

Patio doors, Entry Doors, and Bays/Bows

500

This is the duration and manpower needed to install a storm door

4hr 2 guy

M
e
n
u