Eaton Aerospace
MSOP Supply Base
Open Orders
Programs
Compliance
100

Currently, there are this many manufacturing sites within Mission Systems Division.

4

100

This is MSOPs largest spend supplier in 2024 & 2025.

Addison Precision

100

This supplier has, by far, the largest value of open purchase orders for MSOP.

Addison Precision

100

This program supports commercial aircraft and helped passengers to safety during the emergency landing by Captain Sully, known as the "Miracle on the Hudson."

Inflation Valves

100

Effective October 1st, 2025, this is the micro-purchase threshold for government purchase order compliance.

$15,000

200

These are the locations of each manufacturing site that makes up the Mission Systems Division.

Bonus: Mission Systems Division was previously owned by this company prior to being bought by Eaton.

Double Bonus: This was the company previous to the bonus above. 


1. Orchard Park, NY 

2. Westminster, MD (PTS)

3. Davenport, IA

4. Wimborne, United Kingdom

Bonus: Cobham

Double Bonus: Carleton Technologies

200

A majority of MSOP's spend is within this commodity.

Machining

200

The largest purchase order placed by MSOP this year for $11.4M went to this supplier.

Pacific Scientific

200

Name 3 of the top 5 programs by supplier spend since 2024.

Inflation Valves, Javelin BCU, JASSM Actuators, MCU, BRU-61 

200

For POs supporting government contracts, pricing must be determined as this through a detailed price analysis.

Fair and reasonable

300

This site is the largest of the Mission Systems Division manufacturing locations.

Davenport, IA

300

In 2024, MSOP received material from this many suppliers. (acceptable answer +/- 20)

371

300

From the open order report, there are this many open purchase orders over $1M (+/- 5)

23

300

For the JASSM and Inflation Valve programs, this commodity contains the vast majority of supplier spend.

Machining

300

Also effective Oct 1st, 2025, this is the dollar threshold that requires a small business subcontracting plan to be provided by the supplier.

$900,000

400

This is the number of manufacturing sites across all 4 divisions of Eaton Aerospace.

41, not including Ultra PCS

400

From January 2025 through September 2025, material has been received from this many suppliers. (Acceptable answer +/- 20)

312

400

In October 2025 alone, MSOP tactical supply chain team placed purchase orders with this many suppliers (+/- 20)

139

400

These two programs have the highest value of receipts in 2025 with $7.2M and $7.1M respectively.

BRU-61 & Javelin BCU

400

This is the most effective way to determine fair and reasonable pricing in a procurement.

Competition

500

Mission Systems Division (MSD) is one of four divisions within Eaton Aerospace. Name the other 3 divisions by 3 letter acronym. 

Bonus: This acquisition will add another division to Eaton Aerospace.

1. ITD (Interconnect Technology Division)

2. FMC (Fluid Motion Control)

3. FED (Fluid Electrical Division)

Bonus: Ultra PCS

500

Name 2 suppliers classified as strategic growth in GPS.

1. Brinkman Defense

2. The Lee Co.

3. Connecticut Spring

4. Harvey Vogel

5. Fastener Tool & Supply

500

We currently have open purchase orders with this many suppliers (+/- 20)

339

500

Within the Javelin Program, name 3 of the top 5 suppliers by value of receipts in 2025

1. Pac-Sci

2. Amphenol

3. Astro

4. AeroBending

5. Pioneer Circuits

500

Certified Cost or Pricing Data is a requirement for single source, non-commercial POs supporting government contracts over $2.5M. This requirement comes from the TINA contract flow down from our customer, what does TINA stand for?

Truth In Negotiations Act

M
e
n
u