GENERATION PLANNING
Aircraft Generation
Expeditionary POL
Expeditionary Site Planning Process and Selection
WRM // BOS
Contingency QD
CDO
100

The generation plan for an entire fleet

AF Information Management Tool (IMT) 2408

100

List the Aircraft Selection “Big Three” considerations 

Mission Capable Status

Available Hours/Time to Next Major Inspection

Scheduled Maintenance (Consider in-garrison capability vs deployed)

100

Identifies resources

Identifies capabilities

Unclassified

BSP/ESP Part One

100

This WRM document IDs/Authorizes WRM in addition to POS and deployment assets

War Plans Additive Requirements Report (WPARR)

100

A burning or hot projection that may transfer thermal energy to the surroundings

Firebands/Fireballs

200

Generation Sequence Action Schedule, for the individual aircraft generation plan

AF IMT 2409

200

Aircraft Sequencing “Big Three”… Fastest to Generate (Primary Consideration)

Current Mission Capable Status

Current Configuration (Consider deployment config)

Current Physical Location

200

DoD classifies overseas basing into two types of locations

Contingency Location (CL) - temporary in nature

 Enduring Location (EL)  

200

Facilities, equipment, basic infrastructure and supplies to support the beddown of deployed forces and aircraft at austere locations

Basic Expeditionary Airfield Resources (BEAR)

200

3 Minimum Requirements for flightline revetments

  • 10 Foot standoff from wall

  • 3 Foot standoff from opening

  • 1 Foot Above Line of Sight

300
The three AMU generation concepts 

Linear

Cellular (“Cell”)

Combination (“Combo”)



300

1x barrel (bbl) = X gallons 

1x Mike Barrel (Mbbl) = x barrels 

42 gallons (gal) 

1,000 barrels

300

3 TYPES OF CONTINGENCY LOCATIONS

Initial - Intended for immediate use by units for a limited time (up to 6 months) 

Temporary - Intended to increase efficiency of operations for use up to 24 months

Semi-permanent - Life expectancy of more than 2 years but less than 25 years

300

High Powered

Ruggedized/Deployable

Audible Alerting System

Wireless transmissions

Giant Voice

300

3 POTENTIAL MUNITIONS STORAGE OPTIONS:

Barricaded Open Storage Modules 

Buffered Storage 

Jungle Growth

400

The three Wing Generation concepts 

1. Lead Unit (Alpha Unit vs. Bravo Unit) 

2. Rainbow

3. Stand-Alone




400

Blank is legally liable for accuracy of daily book/physical inventories and transactions

The Responsible Officer (RO)

400

Combat Air Base Planning is a planning framework that includes 3 key planning items

Mission analysis

Threat analysis

Site analysis

400

Works for Base Civil Engineering and supports beddown and sustainment

Prime BEEF

400

Define Contested Operations, Degraded Operations, and Operational Limitations  

Enemy Action 

Failed Systems

Physical/Operational Environment

500

TTP's Generation Planning 6-Step Process 

List steps 1 - 4 

Step 1:  Understand the tasking

Step 2:  Understand the wing’s generation concept

Step 3:  Choose an AMU generation concept

Step 4:  Build/understand/utilize the unit’s 2408/2409/GFP

500

Air transportable aircraft & ground fuels support for bare base or to expand capability of established base 

Fuels Operational Readiness Capability Equipment (FORCE)

Assets are classified as WRM, not BEAR 

500

Expeditionary Site Survey process is composed of three interactive processes

Site Selection Process 

Data Collection Process 

Data Storage and Access Process

500

en route care to a medical facility that meets needs of patients

EN ROUTE CASUALTY CARE SYSTEM (ERCCS) - Level III

500

R3 TOOL

Recognize

Respond  

Report IAW local procedures and IAW
applicable Technical Orders (TO 33-1-38)

M
e
n
u