Resource Management
Project Work PLanning
Contracts
Project Execution
Project Quality Control
100

HOW DO YOU CALCULATE THE UTILIZATION RATE?

(DIRECT LABOR / TOTAL LABOR HOURS) X 100%


100

WHAT ARE THE PRIMARY AND SECONDARY FACTORS FOR DESIGN BID BUILD

PRIMARY COST - SECONDARY RISK

100

WHAT IS THE NAME OF THE CONTRACT BETWEEN ARCHITECT AND CONSULTANT?

C401

100

WHAT ARE THE 4 METHODS OF HISTORIC PRESERVATION?

1. PRESERVATION

2. REHABILITATION

3. RESTORATION

4. RECONSTRUCTION 

100

A FORMAL, LEGALLY BINDING PROCESS FOR RESOLVING DISPUTES WITHOUT LITIGATION

ARBITRATION

200

HOW TO CALCULATE CHARGABLE RATE?

(TOTAL DIRECT SALARY/ TOTAL SALARY EXPENSE) X 100%

200

WHEN DOES AN ARCHITECT GIVE AN ESTIMATE ON THE COST OF THE WORK?

AT THE END OF EACH PHASE

200

WHO PREPARES A CHANGE ORDER?

THE ARCHITECT

200

WHO SIGNS A CHANGE ORDER?

ARCHITECT, OWNER AND CONTRACTOR

200

IF WE HAVE CONFLICTING CODE REFERENCES BETWEEN IBC, NFPA, AND AHJ FOR MEANS OF EGRESS ON A PROJECT, WHICH ONE SHOULD THE ARCHITECT FOLLOW 

THE ARCHITECT SHOULD ALWAYS ADOPT THE MOST STRINGENT CODE

300

METHOD COMMONLY USED FOR SCHEDULING DESIGN AND CONSTRUCTION PROJECTS. TASKS ARE LISTED IN CHRONOLOGICAL ORDER ON VERTICAL ACCESS AND THE TIME PERIOD IS LISTED ON HORIZONTAL AXIS

GRANTT CHART OR BAR CHART

300

WHAT ARE THE PROJECT DELIVERY METHODS THAT HAS THE CONSTRUCTION COST DETERMINED AFTER DESIGN?

1. TRADITIONAL DESIGN BID BUILD

2. NEGOTIATED SELECT TEAM

3. CM-CONSTRUCTOR

4. DESIGN BUILD BRIDGING


300

WHAT IS THE CONTRACT NUMBER FOR IPD ?

A295

300

WHAT ARE 5 BASIC SERVICES OF AN ARCHITECT?

SD, DD, CD, PROCUREMENT PHASE, CONSTRUCTION PHASE

300

AN ORGANIZED SET OF PROCEDURES, SYSTEMS, AND TOOLS ESTABLISHED BY AN OFFICE THAT AID IN MEETING THE EXPECTATIONS OF THE CLIENT, MAINTAINING A HIGH LEVEL OF PROFESSIONAL SERVICES AND REDUCING RISKS AND LIABILITY

QUALITY CONTROL (QC)


400

WHAT DO YOU CALL THE PROCESS OF REVIEWING INDIVIDUAL SYSTEMS AND MATERIALS TO SEE IF THE SAME FUNCTION CAN BE ACCOMPLISHED IN A LESS EXPENSIVE WAY?

VALUE ENGINEERING

400

WHAT DO YOU CALL THE RELATIONSHIP BETWEEN A TASK THAT MUST BE COMPLETED BEFORE ANOTHER CAN START

CONTIGENT 

400

OTHER SERVICES NOT APART OF BASIC SERVICES WHICH CAN INCLUDE PROGRAMMING, BUILDING INFORMATION MODELING, LEED CERTIFICATION, AND POST OCCUPANCE EVALUATION

SUPPLEMENTAL AND ADDITIONAL SERVICES

400

THE STAGE AT WHICH THE WORK, OR A DESIGNATED PORTION OF IT, IS SUFFICIENTLY COMPLETE THAT THE OWNER CAN OCCUPY IT OR USE IT FOR ITS INTENDED PURPOSE

SUBSTANTIAL COMPLETION

400

A SMALL GROUP OF EMPLOYEES WHO MEET REGULARLY TO IDENTIFY, ANALYZE, AND SOLVE PROBLEMS RELATED TO THEIR PARTICULAR SPHERE OF WORK

QUALITY CIRCLE

500
WHAT IS THE CHART USED TO MONITOR EMPLOYEES TIME SHEETS WEEKLY IN ORDER TO COMPARE THE ACTUAL HOURS EXPENDED TO THE BUDGERTED TIME AND TAKE CORRECTIVE ACTION IF THE ACTUAL TIME EXCEEDS THE BUDGETED TIME.

PROJECT MONITORING CHART

500

WHAT DO YOU CALL THE MAXIMUM LENGTH OF TIME A NONCRITICAL TASK CAN BE DELAYED OR EXTENDED BEFORE IT CAUSES A DELAY?

FLOAT

500

GUARANTEES PAYMENT FOR LABOR AND MATERIALS TO SUPPLIERS, EMPLOYEES, OR SUBCONTRACTORS BY THE DEFAULTING CONTRACTOR

LABOR AND MATERIAL BOND

500

A SHORT FORMAT SUMMARY OF MATERIAL OR PRODUCT'S PROPERTIES AND CHARACTERISTICS AND IS OFTEN INCLUDED IN THE PRODUCT DATA SUBMISSION 

CUT SHEET


500

A DOCUMENT THAT THE PM PREPARES THAT SSIGNS TASKS TO SPECIFIC TEAM MEMEMBERS 

RESPONSIBILITY MATRIX