HOW DO YOU CALCULATE THE UTILIZATION RATE?
(DIRECT LABOR / TOTAL LABOR HOURS) X 100%
WHAT ARE THE PRIMARY AND SECONDARY FACTORS FOR DESIGN BID BUILD
PRIMARY COST - SECONDARY RISK
WHAT IS THE NAME OF THE CONTRACT BETWEEN ARCHITECT AND CONSULTANT?
C401
WHAT ARE THE 4 METHODS OF HISTORIC PRESERVATION?
1. PRESERVATION
2. REHABILITATION
3. RESTORATION
4. RECONSTRUCTION
A FORMAL, LEGALLY BINDING PROCESS FOR RESOLVING DISPUTES WITHOUT LITIGATION
ARBITRATION
HOW TO CALCULATE CHARGABLE RATE?
(TOTAL DIRECT SALARY/ TOTAL SALARY EXPENSE) X 100%
WHEN DOES AN ARCHITECT GIVE AN ESTIMATE ON THE COST OF THE WORK?
AT THE END OF EACH PHASE
WHO PREPARES A CHANGE ORDER?
THE ARCHITECT
WHO SIGNS A CHANGE ORDER?
ARCHITECT, OWNER AND CONTRACTOR
IF WE HAVE CONFLICTING CODE REFERENCES BETWEEN IBC, NFPA, AND AHJ FOR MEANS OF EGRESS ON A PROJECT, WHICH ONE SHOULD THE ARCHITECT FOLLOW
THE ARCHITECT SHOULD ALWAYS ADOPT THE MOST STRINGENT CODE
METHOD COMMONLY USED FOR SCHEDULING DESIGN AND CONSTRUCTION PROJECTS. TASKS ARE LISTED IN CHRONOLOGICAL ORDER ON VERTICAL ACCESS AND THE TIME PERIOD IS LISTED ON HORIZONTAL AXIS
GRANTT CHART OR BAR CHART
WHAT ARE THE PROJECT DELIVERY METHODS THAT HAS THE CONSTRUCTION COST DETERMINED AFTER DESIGN?
1. TRADITIONAL DESIGN BID BUILD
2. NEGOTIATED SELECT TEAM
3. CM-CONSTRUCTOR
4. DESIGN BUILD BRIDGING
WHAT IS THE CONTRACT NUMBER FOR IPD ?
A295
WHAT ARE 5 BASIC SERVICES OF AN ARCHITECT?
SD, DD, CD, PROCUREMENT PHASE, CONSTRUCTION PHASE
AN ORGANIZED SET OF PROCEDURES, SYSTEMS, AND TOOLS ESTABLISHED BY AN OFFICE THAT AID IN MEETING THE EXPECTATIONS OF THE CLIENT, MAINTAINING A HIGH LEVEL OF PROFESSIONAL SERVICES AND REDUCING RISKS AND LIABILITY
QUALITY CONTROL (QC)
WHAT DO YOU CALL THE PROCESS OF REVIEWING INDIVIDUAL SYSTEMS AND MATERIALS TO SEE IF THE SAME FUNCTION CAN BE ACCOMPLISHED IN A LESS EXPENSIVE WAY?
VALUE ENGINEERING
WHAT DO YOU CALL THE RELATIONSHIP BETWEEN A TASK THAT MUST BE COMPLETED BEFORE ANOTHER CAN START
CONTIGENT
OTHER SERVICES NOT APART OF BASIC SERVICES WHICH CAN INCLUDE PROGRAMMING, BUILDING INFORMATION MODELING, LEED CERTIFICATION, AND POST OCCUPANCE EVALUATION
SUPPLEMENTAL AND ADDITIONAL SERVICES
THE STAGE AT WHICH THE WORK, OR A DESIGNATED PORTION OF IT, IS SUFFICIENTLY COMPLETE THAT THE OWNER CAN OCCUPY IT OR USE IT FOR ITS INTENDED PURPOSE
SUBSTANTIAL COMPLETION
A SMALL GROUP OF EMPLOYEES WHO MEET REGULARLY TO IDENTIFY, ANALYZE, AND SOLVE PROBLEMS RELATED TO THEIR PARTICULAR SPHERE OF WORK
QUALITY CIRCLE
PROJECT MONITORING CHART
WHAT DO YOU CALL THE MAXIMUM LENGTH OF TIME A NONCRITICAL TASK CAN BE DELAYED OR EXTENDED BEFORE IT CAUSES A DELAY?
FLOAT
GUARANTEES PAYMENT FOR LABOR AND MATERIALS TO SUPPLIERS, EMPLOYEES, OR SUBCONTRACTORS BY THE DEFAULTING CONTRACTOR
LABOR AND MATERIAL BOND
A SHORT FORMAT SUMMARY OF MATERIAL OR PRODUCT'S PROPERTIES AND CHARACTERISTICS AND IS OFTEN INCLUDED IN THE PRODUCT DATA SUBMISSION
CUT SHEET
A DOCUMENT THAT THE PM PREPARES THAT SSIGNS TASKS TO SPECIFIC TEAM MEMEMBERS
RESPONSIBILITY MATRIX