Batch Types
Form/Report
UND Mail
Process Codes/IRM References
Scanning
100

What are the batch types for agreed and response CP 2000?

BT 51 agreed

BT 52 response

100

What form we use to route out mail to area outside our campus?

Form 3210

100

You should only build undeliverable notices with notice indicator of what?

1

IRM 4.19.2.3.29

100

What is our primary IRM?

IRM 4.19.2

100

What is the order of operation for getting the paper documents into digital format?

Doc prepping, scanning, and validation.

200

What are the batch types for agreed and response Stats?

BT 71 agreed

BT 74 response

200

On Form 3210, what part do we keep when mailing out?  What part do we get back?

Keep part 4.  Part 3 we get back.

200

Name all the undeliverable batch types.

BT 49 for CP 2501

BT 59 for CP 2000

BT 85 for STATS

200

What is the PC for a fully agreed CP 2000?

PC 67.


IRM 4.19.2.8.34

200

What is the page limit for a batch to be scan to Ephesoft?

200 pages or less.

300

What are the three types of BT 59?

Undeliverable

No Response

PC 75

300

This listing identifies BT 38, 49, 59, and 79, that were systemically built and are ready to be updated to "RB" status. This listing also identifies BT 84 that were systemically built and are ready to be updated to "AB" status.

RB Auto Purge Batches Report


IRM 4.19.2.10.7.2 

300

Notice Indicator 1, 2, 3, and 4 stand for what?

1 = pirmary

2 = spouse

3 = POA

4 = second POA

IRM 4.19.2.4.3

300

A process code (PC) is made up of what?

Two numeric characters.


IRM 4.19.2.8

300

What should you do if you have to force quit during scanning?

Run the ForceQuit and ForceStart command.

400

What is the order for building BT 59 and BT 79 fallouts?

BT 59 = Build to BT 53 or 52 first, build to BT 84 last if unable to build to BT 53 or 52.

BT 79 = Build to ???

400

This listing identifies cases that contain conditions (fallouts) during the auto purge requiring Tax Examiner or Coordinator review and must be printed and worked on a weekly basis.

Note:

As the fallout conditions contain cases such as identity theft and ARDI it is important that the cases on the list are worked timely.

Auto Purge Pull Listing.


IRM 4.19.2.10.7 

400

What are the three undeliverable indicator codes?

T - True Undeliverable: Cases where no new address was found

M - Remail: Cases where a new address was found

U - Undeliverable: Cases with a new address, but other conditions prevent the notice from being remailed (such as, Payer/Agent conditions or new transactions)

IRM 4.19.2.3.29

400

What is the differences between a Process Code (PC) and an Internal Process Code (IPC)?

Process Codes (PC) consist of two numeric characters. Process codes reflecting program selection, notice and amended notice issuance, assessments, and closures are uploaded to IDRS. The AUR system provides an automatic upload of PC updates to IDRS when the batch is in "DC" (Disassembly Complete) status. Process codes are associated with the Transaction Code (TC) 922 on IDRS. Each PC posted to IDRS updates the TC 922 date.

IRM 4.19.2.8

IPC codes are used within the AUR system for tracking cases and are not uploaded to IDRS.

IRM 4.19.2.9

400

When scanning Extract, what is the primary difference compare to other work type such as regular mail and OTR?

After scanning is complete, Extract work needs to be re-assembled for shipping back to Files instead of being held on the suspense wall.

500

The AUR inventory is ordered in groups referred to as extracts numbered from what to what? When the returns are received they are built, either manually or systemically, into batch types that match the extract number

01-19.


IRM 4.19.2.5.3.1 

500

This report identifies BTs 67 and 87 that have been in "AB" batch status for one or more processing cycles.

This report is used to determine which BT 67 and BT 87 batches require updating to "RB" batch status.

Partially Agreed Aging Report


IRM 4.19.2.10.17

500

What should you never do with an undeliverable 2625C letter with form 2624?

Discard it.  Send it to File instead.

IRM 4.19.2.3.29(5)

500

Define the numeric number 0, 3, 6, 8, and 9 of the Internal Process Code.

The numeric character defines the phase of program as follows:

  • 0 designates the case analysis or screening phase

  • 3 designates the CP 2501 response phase

  • 6 designates the CP 2000 response phase

  • 8 designates the Stat response phase

  • 9 designates RECON phase


IRM 4.19.2.9


500

What is the procedure for an IA request on an unsigned Agreed response.

Make a photocopy of the IA request and stamp it with "9465 w/AUR Assess".  Send the copy to Collection.  Doc prep the original for scanning.


IRM 4.19.2.4.6.2

M
e
n
u