3 prerequisites to become a Team Chief
1. Graduated EI Team Chief Academy
2. 7-Level in Current AFSC
3. SSgt or higher
4. 200 F JQS
5. Perform a certification job
Report that is sent back weekly to your PM
What is the 752 and 752A
PSA
What is a Project Support Agreement
Cable cut
What is an AFTO Form 765
To show that the engineer is stupid.
What is not a reason for a thorough project package review.
3 Types of Team Chief Evaluations
3 individuals to always include in project-related emails.
Who are:
1. Project Manager
2. Customer (SCX)
3. W/C Supervisor
PLOA
What is a Project Letter of Agreement
Mishap Report
What is an AF Form 978
What is contained in Section 1 of the LOM
Encompasses selection of candidates, formal training, OJT, and trial performance as a Team Chief Nominee, evaluation and certification.
As a TC, make sure your team has this form before entering a Confined Space
What is a AF Form 1024 Confined Space Entry Permit
LOCA
What is a Letter of Custodial Agreement
Project Package Review & Modification
What is the 750 and 750A
If there is an issue that the engineer and Team Chief cannot agree upon with the Team Chief Review, I will make the final decision.
Who is QA
3 of the 7 criteria that QA will utilize to measure your performance as a Team during your evaluation.
1. Conditions
2. Qualifications
3. Customer/Supplier Relationship
4. Technical Accomplishments
5. Team Management
6. Leadership
7. Administration
Project changes initiated by the EI team that need to be routed to the Project Engineer must be annotated where?
What is the AFTO Form 750A
PSS
What is the Pre-Implementation Site Survey
System Acceptance
What is the AFTO Form 747
4 steps (listed in order) to complete a complete package review
What are:
1. Inventory
2. Familiarization
3. Review
4. Documentation
4 of the 5 Requirements to become a Team Chief Nominee (TCN) as outlined in the 2002.
1.Staff with 5-level in current AFSC
2.Supervisor Safety Training
3. Graduate SIPT Course
4. Approved by Operations Office
5. Formally entered into TCN nominee program using the checklist
What is Chapter 2
ECR/A
What is an Engineering Change Request/Authorization
Pre & Post Implementation Checklist
What is the AFTO 751
Five items that are required for each write-up for your initial package review
What are:
1. Location in checklist on 750
2. Location in Package
3. Issue
4. Fix
5. Reference