Guess the LOO
Tech & Terms
Stakeholder Acronyms (And what they stand for)
A-OTHR 101
Arctic Geography
100

This LOO is responsible for Total program integration and execution, Integrated master schedule, Cost Management, Risk management, Stakeholder communications, System Procurement, Fielding, Installation, Sustainment.

What is LOO 1?

100

________ is a electrically charged region in Earth's upper atmosphere, extending from about 50 to 1000 kilometers above the surface. 

What is an Ionosphere?

100

Our main program sponsor

Royal Canadian Air Force (RCAF)

100

What does A-OTHR stand for?

What is Arctic Over The Horizon Radar?

100

This is Canada’s northernmost permanently inhabited place

What is Alert?

200

This LOO is responsible for System fielding and integration logistic support (ILS),Training and Post installation supply chain management

What is LOO 5?

200

The A-OTHR system tracks incoming missiles, aircraft and ____

What is a ship?

200

Responsible for Industrial and Technological Benefits Policy

What is Innovation, Science and Economic Development Canada (ISED)?

200

What country is A-OTHR's biggest partner?

What is Australia?
200

Who is our Project Control Officer?

Who is Caroline Noël

300

This LOO is responsible for:

1. Radar Systems requirements development
2. System requirements development
3. Systems engineering
4. Installation
5. System Integration
6. Developmental / Operational Testing
7. System fielding and integration

What is LOO 3?


300

The process of bouncing radar signals off the Ionosphere

What is Skywave Propagation?

300

A combined organization of the United States and Canada that provides aerospace warning, air sovereignty, and protection for Canada and the continental United States.

What is the North American Aerospace Defense Command (NORAD)?

300

The number of LOOs in our team

What is 5?

300

The A‑OTHR system is designed to detect threats over this major ocean

What is the Arctic?

400

This LOO is responsible for: 

1.Cyber
2.Command and Control networks requirements development
3.System requirements development
4.Developmental / Operational Testing
5.Software engineering
6.Systems engineering
7.System fielding and integration

What is LOO 4?

400

A-OTHR consists of three main areas of investment, TX and RX sits, Transmitters and Receivers and ______

What is Control Functionality?

400

Our Canadian OTHR counterpart's new name

What is the Project Domain Awareness (PDA)?

400

Our program ID number

What is C.001842?

500

This LOO is responsible for:

1. Site analysis / selection
2.Land acquisition / real property management
3.Environmental analysis
4.Construction requirement development / management
5.Site construction management

What is LOO 2/ADM IE?

500

These are traditionally found on what site?

 

What is a receiver site?

500
Our Australian Counterpart

What is the Jindalee Operational Radar Network (JORN)?

500

The third phase in our program

What is the definition phase?

M
e
n
u