Project Management/Contracts
Integrus Office
Handrails
Project Delivery
Acronyms
100

B103

This is the AIA contract document number for the contract between owner and architect

100

A Gallery

The Art Gallery in the entrance of the Seattle Office

100

34"-38"

What height does a handrail need to be installed at?

100

CA

Construction Administration

200

In a GCCM process, who is the owner?

This is the stakeholder having a direct contractual relationship with the GCCM during design

200

Spokane, Seattle, and Portland

The three office locations

200

Rise

The height of a stair.

200

Uniformat

This is the contractor's preferred format for classifying building elements

200

HSS

Hollow Steel Section

300

It's indicated by the Flag in this Symbol

Field Weld

300

Glacier

300

CCD and ASI

Construction Change Directive and Architectural Supplemental Instruction

400

WRB

Weather Resistant Barrier

M
e
n
u