B103
This is the AIA contract document number for the contract between owner and architect
A Gallery
The Art Gallery in the entrance of the Seattle Office
34"-38"
What height does a handrail need to be installed at?
CA
Construction Administration
In a GCCM process, who is the owner?
This is the stakeholder having a direct contractual relationship with the GCCM during design
Spokane, Seattle, and Portland
The three office locations
Rise
The height of a stair.
Uniformat
This is the contractor's preferred format for classifying building elements
HSS
Hollow Steel Section
It's indicated by the Flag in this Symbol
Field Weld

Glacier
CCD and ASI
Construction Change Directive and Architectural Supplemental Instruction
WRB
Weather Resistant Barrier