This Exhibit is utilized for the project manager or designee to write the business terms and conditions.
What is Exhibit D
These sections of the subcontract incorporate prime contract documents.
What are Instructions, Terms and Conditions Section 1. PRIME CONTRACT, Exhibit A List of Documents, & Exhibit P Special Provisions?
Section 7 of the subcontract and Exhibits K-1 address this Austin Industries core value.
What is safety?
This section details the requirements and procedures for terminating a subcontractor for cause, including the necessary letters to be sent.
What is "Termination for Cause"?
This exhibit entails SWPPP information.
What is Exhibit L?
OCIP is an acronym for this type of insurance program.
What is Owner Controlled Insurance Program?
This subcontract section should be referenced when a subcontractor conveys they potentially have additional costs to the job.
What is Section 11. CLAIMS?
A bond waiver for $1,000,000 or more must be signed by this person.
Who is EVP Operations Ben Hewett?
These documents are contained in Exhibit F
What are payment waivers?
This section details the requirements and procedures for terminating a subcontractor for cause, including the necessary letters to be sent
What is "Termination for Cause"?
Subcontractor expressly assumes the risk of non-payment by Owner, and the Subcontract Amount explicitly envisions and includes this risk is commonly called this shorter phrase.
What is pay when paid language.
This type of agreement is used when there is no master agreement and is specific to a single project.
What is a "Single Occurrence Subcontract Agreement"
These documents are contained in Exhibit E
What are payment and performance bonds?
This entity has lower required insurance limits than Austin Bridge & Road, LP.
Who is the Texas Department of Transportation?
This phrase should never be changed in subcontract section 9. COMMENCMENT AND COMPLETION OF WORK.
What is, "Time is of the essence in this Agreement"?
This type of insurance is required for subcontractors whose work may involve excavations that could potentially hit sewers, fuel, oil pipelines, or other hazardous storage.
What is "Pollution Liability Insurance"?
Exhibit A: List of Documents, Exhibit D: Special Conditions Inclusions & Exclusions, Exhibit I: Schedule, Exhibit P: Special Provisions have this attribute in common.
What are exhibits that have to be customized for each job?
This section in the contract contains hold harmless language specifically for a subcontractor's employees.
What is Exhibit D.1 State Specific Terms A.1?
These sections of the subcontract allow ABR to issue joint checks and or offset sums (back charge)?
What are sections 4.H & 4.J?
This insurance coverage is required if the prime contract documents specify that a consultant or subcontractor must provide engineered calculations or designs for the work, such as stamped drawings.
What is Professional Errors and Omissions liability insurance?