15+37=____
52
24-17=____
7
55-26+16=____
45
An apprentice is asked to find a distribute the sag rods needed for each elevation. Side A needs 39, Side B needs 42, Side C needs 29, and Side D needs 68. How many sag rods does the apprentice need to find?
178 sag rods
The distance around a piece of stone is 54". Three of the sides measure to be 8", 8", and 19". What is the length of the remaining side?
19"
103+81=____
184
112-37=____
75
28+10-35+14=____
17
A piece of stone measures 25" on the two longer sides and 16" on the two shorter sides. What is the perimeter of the stone?
82"
A contractor has 126 Craftworkers on their payroll, 8 called in sick on Tuesday and 13 were laid off. How many Craftworkers are left on the payroll for Tuesday?
105 Craftworkers are left on payroll for Tuesday
379+169+2387=____
2935
13586-1570=____
12016
(50-18)+50=____
82
A template needs to be fabricated that will hold in place clips to be welded in the same location on each floor of the building. The center to center distances of these clips are 20", 34", 48", 55", 44", 32", and 26". What is the center to center distance from the center of the first clip to the center of the last clip?
259"
At the end of a five year apprenticeship, you work a total of 7823 hours. The first year you work 1256 hours, the second year you work 1423 hours, the third year you work 1525 hours, the fourth year you work 1758 hours. How many hours did you work in your fifth year?
1861 hours
339+658+1854+2000=____
4851
8047-4508=____
3539
620-(30+35+227+174)=____
154
A foreman asks an apprentice to go and get a 300 foot tagline out of the trailer because they are going to do a lift to the top floor that has to be controlled from the street. When the apprentice gets to the trailer, they find an assortment of lines of the following lengths: 56', 98', 36' 25' and 44'. What is the length of the lines connected together? Will it be long enough?
259', it will not be long enough
20000 lbs of rebar was delivered on Monday. The following amounts were tied into place per day: Monday: 3600 lbs, Tuesday: 3585 lbs, Wednesday: 4990 lbs, and Thursday: 3285 lbs. How much is left to tie on Friday?
4540 lbs
1247+6006+12306+15035=____
34594
50968-8934=____
42034
18000-(220+3490+1745+4225)=____
6340
A concrete crew plans to pour four pads at the same time. The closest load point to the four pours is 186'. Each pour is an additional 36' further from the closest pad. What is the distance of the furthest pad?
294'
On Friday, you get your first apprentice paycheck of $783. You have to pay union dues of $40, gas for your car for $40, car insurance for $236 and groceries for $168. How much is left until next week.
$299