An apprentice is asked to find a distribute the sag rods needed for each elevation. Side A needs 39, Side B needs 42, Side C needs 29, and Side D needs 68. How many sag rods does the apprentice need to find?

178 sag rods

100

The distance around a piece of stone is 54". Three of the sides measure to be 8", 8", and 19". What is the length of the remaining side?

19"

200

103+81=____

184

200

112-37=____

75

200

28+10-35+14=____

17

200

A piece of stone measures 25" on the two longer sides and 16" on the two shorter sides. What is the perimeter of the stone?

82"

200

A contractor has 126 Craftworkers on their payroll, 8 called in sick on Tuesday and 13 were laid off. How many Craftworkers are left on the payroll for Tuesday?

105 Craftworkers are left on payroll for Tuesday

300

379+169+2387=____

2935

300

13586-1570=____

12016

300

(50-18)+50=____

82

300

A template needs to be fabricated that will hold in place clips to be welded in the same location on each floor of the building. The center to center distances of these clips are 20", 34", 48", 55", 44", 32", and 26". What is the center to center distance from the center of the first clip to the center of the last clip?

259"

300

At the end of a five year apprenticeship, you work a total of 7823 hours. The first year you work 1256 hours, the second year you work 1423 hours, the third year you work 1525 hours, the fourth year you work 1758 hours. How many hours did you work in your fifth year?

1861 hours

400

339+658+1854+2000=____

4851

400

8047-4508=____

3539

400

620-(30+35+227+174)=____

154

400

A foreman asks an apprentice to go and get a 300 foot tagline out of the trailer because they are going to do a lift to the top floor that has to be controlled from the street. When the apprentice gets to the trailer, they find an assortment of lines of the following lengths: 56', 98', 36' 25' and 44'. What is the length of the lines connected together? Will it be long enough?

259', it will not be long enough

400

20000 lbs of rebar was delivered on Monday. The following amounts were tied into place per day: Monday: 3600 lbs, Tuesday: 3585 lbs, Wednesday: 4990 lbs, and Thursday: 3285 lbs. How much is left to tie on Friday?

4540 lbs

500

1247+6006+12306+15035=____

34594

500

50968-8934=____

42034

500

18000-(220+3490+1745+4225)=____

6340

500

A concrete crew plans to pour four pads at the same time. The closest load point to the four pours is 186'. Each pour is an additional 36' further from the closest pad. What is the distance of the furthest pad?

294'

500

On Friday, you get your first apprentice paycheck of $783. You have to pay union dues of $40, gas for your car for $40, car insurance for $236 and groceries for $168. How much is left until next week.