Where can you go to find AEP Standard Work proceedures.
The AEP QAS intro net site.
What is the name of the Plant in Arkansas where DSI and Baghouse was installed and recently installed a Bottom Ash Drag Chain Conveyor?
Flint Creek Plant.
Where is the first only Pump Storage Hydro Electric Generation?
Smith Mountain Hydro in VA.
What plant site was the first B&W 1300 mw power plant located?
Amos Unit 3 at Winfield, WV.
Who was the first AEP women CEO?
Julie Sloat
What procedure covers a Project Initiation?
E-OI-710.
What is the name of the AEP Plant was the last Coal Fired Plant built (Ulta-Super Critical)?
Turk Plant in Texarkana Arkansas.
What is the name of the AEP Hydro generation plant located in Marmet WV?
Marmet Hydro Lock and Dam located on the Kanawha River.
Where was the first location of 2 - B&W 1300 mw power plants located?
Gavin Plant Chesire, OH
Who was the CEO when AEP merged with CSW?
Dr. E. Lin Draper
What procedure covers Safety in Design?
JA-QMSU-OI-730.12.01
What AEP Oklahoma Combustion Engineering Tangential fired coal plant where a DSI was installed and now may be converted to purely Natural Gas.
Northeastern Unit 3.
What is the name of the AEP Hydro Generation Plant located in London, WV?
London Lock and Dam on the Kanawha River at London, WV.
Where was the first AEP Foster Wheeler 800 mw power plant built?
Amos Unit 1, Winfield, WV
Who was AEPs CEO when Zimmer was converted from Nuclear to Coal?
Pete White
What procedure covers Project Change Control?
PG-737.01
What two coal fired units located in Texas that are being engineered/converted to run on Natural Gas?
Welsh Units 1 & 3.
What is the name of the AEP Hydo generating plant located in Winfield, WV?
Windfield Lock and Dam on the Kanawha River at Winfield, WV.
Where was the first B&W 600 mw AEP power plant located?
Muskingum River Unit 5.
What AEP CEO was also on the Rock & Roll Hall of Fame Board of Directors?
Nick Akins
What procedure has the Project Change Request (PCR) form?
PG-737.01 Exhibit 2
What simple cycle natural gas combustion turbine power plants were installed in Tontitown Arkansas and is controlled from Flint Creek?
Tontitown, Arkansas four GE - 7EA Combustion Turbines.
What is the name of the Lock and Dam where AEP just recently renovated?
Racine Lock and Dam located at Recine, OH.
Where is the first Hyperbolic Cooling tower in the Eastern Hemisphere built?
Big Sandy Unit 1 in Ky.