Environment
(Un)Democratic Process
Train Dreams
HSReality
'National Interest'
100

This will happen only when a route is chosen.

What is an environmental assessment.

100

Modifies the Expropriation Act to speed up land acquisition for high-speed rail projects.

What is Part 5, Division 5 of Bill C15?

100

This struggling Crown corporation faces chronic operational challenges and owns Alto.

What is VIA Rail Canada?

100

90 billion dollars

What is a ridiculous cost downloaded to Canadian taxpayers?

200

A permanent structure that will grossly impede both human and wildlife movement.

What is 12ft high fencing along a 1,000km track?

200

The Crown is not required to negotiate or attempt to purchase land before initiating expropriation for the rail corridor.

What is Elimination of Purchase Attempts?

200

Year 48.

How long will it take for Alto's high-speed train to break even.

300

A UNESCO-designated biosphere at risk of devasation if a high-speed train is built through it.

What is the Frontenac Arch Biosphere?

300

People without reliable internet.

Who have Alto forgot to include during the consultation process? 

300

A highly toxic chemical that naturally leeches from concrete and has been found pooling at HS2 construction sites in Britain.

What is chromium 6?

400

These have never appeared in any ALTO public document to date.

What are cold-climate engineering, unstable ground (Leda clay), and road severance?

400

European rail is in part successful because of this.

What is passenger-first legislation? 