Potpourri
Planning
Analysis
Diagrams
Math
100

The four stages of an SDLC

What is Planning, Analysis, Design, & Implementation?

100

a diagram commonly used by project managers to convey schedule

What is a gaant chart?

100

What the software should do

What is a functional requirement?

100

The name of a diagram type for a business process model

What is a data flow diagram?

100

What is the formula for ROI?

What is (Total Benefits - Total Costs)/Total Costs?

200

person who bridges the communications gap between those who need the computer and those who understand the technology.

Who is systems analyst?

200

The three concepts a project manager must trade off between.

What is 

- size

- time

- cost?

200

The three basic steps of analysis

What is 

- Understand current situation (as-is)

- Identify improvements

- Define requirements for new system (to-be)

200

The name of a data diagram

What is an Entity Relationship Diagram?

200

Industry standard formula for calculating length of a project

What is 

15% Planning

20% Analysis

35% Design

30% Implementation ?

300

Name 3 of 5 systems analyst roles

What is

- Business analyst

- Systems analyst

- Infrastructure analyst

- Change management analyst

- Project manager?

300

Name 3 of 5 types of SDLC methodologies

What is 

- waterfall

- parallel development

- V-model

- Rapid application development

- Agile ?

300

the characteristics a system should have

What is a non-functional requirement?

300

Data about data

What is metadata?

300

= # of years of negative cash flow + (that year’s net cash flow – that year’s cumulative cash flow) / that year’s net cash flow

What is formula for Break Even Point?

400

the generic term for output of a step in one of the phases of our SDLC

What is a deliverable?

400

The adding of requirements after a projects scope has been locked.

What is scope creep?

400

Two types of functional requirements

What is 

- process oriented

- information oriented?

400

1NF, 2NF, 3NF

What are the forms associated with normalization?

400

Number of child entities when modality is null

What is 0?

500

Matrix we use to define interaction between data flow diagram and entity relationship diagram

What is CRUD matrix?

500

Group who determines which projects will get funded and which projects won't

Who is approval committee?

500

Name three sections on a use case

What is name, ID, importance, primary actor, short description, Trigger, type, major inputs, major outputs, major steps performed, information for steps?

500

The three step process for creating an intersection entity

What is

1. Remove the M:N line and insert new entity

2. Add two 1:N relationships

3. Name the intersection entity?

500

Formula for # of communication channels within a team

 What is [N * (N-1)] / 2, where N = # of team members?

M
e
n
u