Acronyms
Safety
Deploy & Offload
Rovebot Controls
Troubleshooting
100

SOC

State of Charge

100

Whenever you are roving another operator should have this

What is the WES?

100

What should be run in main-ai before starting your deploy or offload?

Tmux

100

Button 1

Ack Fault

100

What is the first thing you do when beginning troubleshooting?

Time stamp the AR

200

WES

Wireless Emergency Stop

200

What is the distance you or any other operator should maintain from the bot?

5 feet

200

What two external devices are needed for a deploy?

Chocks and powermax

200

Shift + 2 

Squat and Charge (Squat part applies to B2 only)

200

How many minutes should you be troubleshooting before you should definitely escalate the issue?

20 minutes

300

PCU

Primary Compute Unit

300

When performing and e-stop check what three things should be done prior to starting the check (triggering the estop)?

Wheel chocks should be on and opposite door should be closed as well as bot placed in neutral gear

300

What website should you check to get an idea of the bandwidth available for your deploy/ ingest prior to sending the command?

300

What will have to be either held down or up for motion controls to work on the bot

Deadman Switches

300

What are some troubleshooting steps that can be taken prior to escalation? (Name 3)

Ack Faults, cycle power states, PC, cycle emu supervisor, restart zcore, re-seat cables, etc..

400

ASC

Active Suspension Controller 

400

When operating the VH6 each seat with a passenger should have this.

What is a 5-point harness?

400

What should be done with the MDI if you include the flag --exclude=mdi?

MDI should be looped

400

Shift + 4

Nothing/ Reserved

400

You escalate to this when you are stuck or have exceeded your time limit on troubleshooting

OnCall

500

CLAMS

Calibration Localization and Mapping Simultaneously 

500

What is the night shift TRR for rain weather in manual and autonomy?

Autonomy = light rain and damp

Manual = no rain and damp

500

What three pieces of information are useful for when you update the software tracker after the deploy (and will match for the EMU and PCU)?

The SHA, branch, and tag

500

How do you start tow mode? 

Shift + Deadmans followed by 1,2,3, and 4 in order

500

You encounter an issue that needs to be troubleshot- what is one reason you would make a ZPT for it  and one reason you would not?

1. Because the issue is non-nominal

2. Because the issue is an expected outcome

M
e
n
u