AMI stands for
Advanced Metering Infrastructure
The AMI programs in OO
AMI Operations & Network Operations
The temperature peak for a hot socket alarm
203 degrees
The attributes used to update non-communicating meters to S/D
Location Attributes 1 & 2
The attributes used to update non-communicating Gas IMUs to S/D
Device Attributes 1 & 2
IMU stands for
Interface Module Unit
The OO program used to find new hard downs
Network Operations
Steps to create hot socket b-tickets for ORU
We don't.
Tickets are automatically generated.
The date the AMI project ends
This year
Battery life for an IMU can last up to
5 years
CPD stands for
Constantly/Continuously Powered Device
Time OO data is delayed
Typically 24 hours
Time before a meter moves into the 'Unreviewed - Backlog" category
24 hours
The last digit of a program ID determines
The interval
1 & 3 - 5 minutes
0 & 2 - 15 minutes
The level a Natural Gas Detector will alarm at
10% of the LEL or .5% of gas in air
STORM stands for
Support Tool For Outage and Restoration Management
The max limit to export data
5,000,000
EDAP hot socket report refreshes
Every 2 hours
The first digit in a program ID determine for an i210 means
Firmware
"2" is for FW 5
"4" is for FW 6
Steps to place an IMU into "Maintenance"
Export IMU data
Delete 'NIC Mac Address' & 'Service Point Utility ID'
Confirm Time Zone 'America/New_York'
Import IMU data
RSSI stands for
Received Signal Strength Indication
The purpose of Gene's NIC Meter Time Sync report
identifies meters failing to send register reads
The ORU DL to send email hot sockets
dl - O&R Hot Sockets
The new performance criteria for network devices
Ping Percentage
Ping Latency
Signal Strength
Natural Gas Detectors & 500T/G IMUs