Contract Coverage
ARMIS Basics
Claim Knowledge
Payments/ Billing
SOP
100

Total 12-month aggregate Limit of Liability 

What is $10,000?

100

(303) 484-6811 is a number for

What is ARMIS Fax 

100

When an appt is set, the date and time goes where

What is schedule date, and claim notes? 

100

A document that needs to be signed 

What is final invoice?

100

Checking in with the CH after two mins

What is Hold procedure?

200

Two items in the contract that has age stipulations

What is water heater and well pump?

200

The seller of the contract 

What is HomeSafe?

200

Notes that are not left in the claim

What is Contract Notes?

200

A call received from the CH once work is completed 

What is Verbal Confirmation?

200

The fourth SP Network on the list for Appliance claims

What is Equips drop-down/ CH history?

300

Fire, freezing, water damage, electrical failure or surge, or excessive or inadequate water pressure are considered what?

What are general exclusions? 

300

The offices are located in these cities

What is St. Louis MO, and Denver CO

300

The claim needs to be in this status if new info is sent in for review

What is Open/Auth?

300

An email a SP can receive once the work is completed 

What is Wex CC email?

300

CH wants to update an error on their address the team to do that is

What is Data Mangement?

400

Per policy the contract holder has ___ days to submit an online dispute resolution form

What is (90) days?

400

The year ARMIS was started

What is 2017?

400

The SP doesn't want Check anymore, the next step is 

What is update the auth note and tag corrected payable?

400

To fix a grey payable 

What is tag corrected payable?

400

Something that needs to be done at the beginning and ending of every call 

What is call branding? 

500

Something that is described as water or steam circulating heat in the contract

What is boiler?

500

Respectful, integrity, innovative 

What is Core Values?

500

CH accepts the cash out instead of replacement, the next step is 

What is update the payable and upload the placeholder?

500

Direct Deposit stopped being our primary form of payment in what month

What is December?

500

The CH is upset and is adamant about speaking to a supervisor, the next step is 

What is De-escalate?

M
e
n
u