How long does it take slit rolls to run?
20 minutes
C/V
conveyor
Winding logistic line
3x8 or 24
What is a cross-functional continuous improvement team event dedicated to an improvement effort
Kaizen event
separator is what color?
White
What is the name of the sensor in helium leakage test?
Sniffer
MDT
Machine down time
How many helium tanks in x-ray?
2
What is the engineering requirement, used for judging the acceptability of a particular product/service based on product characteristics, such as appearance, performance, and size.
Specification
QR code printed on what film?
Blue
Checked daily for loose bolts
Cantilever
JPH
Jobs per hour
How many filters are on the anode side?
2
What is the ideal state for just-in-time production where the practice is to make one part and move one part, at the pace of takt time to meet (internal or external) customer demand
Continuous flow
what is the color of the pinch point sign?
Yellow
what are the 5 dust removing instruments?
air knife, brush, ultrasonic air knife, magnetic bar, and ion wind generator
VOC
Volatile organic compound
4 major process in winding
Loading slit rolls, laser cutting tabs into foil, winding the foil into jelly roll, tab flattening.
What process also known as “quick changeover” is designed to improve change-over efficiencies utilizing Lean tools.
SMED or Single-Minute Exchange of Dies
Cells used for calibration
Red
What is the vision of AESC?
Lead the de-carbonization revolution through AIoT
DOWNTIME
Defect, overproduction, waiting, non-utilized talent, transportation, inventory, and extra processing
How many maintenance men per line?
4
What means “signboard” in Japanese and translates to “signals” in Lean manufacturing. Signals are used to trigger manufacturing, re-stocking, or purchasing of parts.
Kanban
What color is now mixed with the anode?
Cobalt