Identify how many Utility DCM's (Device Control Module) there are on the Chemistry or Immunoassay analyzer.
There are 2. DC DCM 01 and DC DCM 02
Number of PFGS boards for a SSCCCH configuration
6 PFGS
How is the control of the coil Board achieved?
a) Wireless comunication
b) The Node Controller (NC) communicates to the Coil Board (CB) through the MAster Board
c) PFGS controls de comunication through the Gigabit Switch (GS)
e) C y B
The Node Controller (NC) communicates to the Coil Board (CB) through the MAster Board
Default password for LabManager
Siemens1234567%
Identify the number of Analyzer Positioning Modules (APMs) required to position and level the CH, IM and SH.
4 APMs
Identify the power that DC-DCM 01 and DC-DCM 02 provide on the CH and the IM systems.
a) Drive power Answer b) AC power Answer c) Logic and Drive power
Logic and Drive power
Functions of the Atellica Wireless Router
Operator Tablet, Service Laptop
Number of Coil Boards on Path 500
a) 10
b) 6
c) 17
d) 15
17 Coil Boards
Identify where the SH Tube Characterization Station (TCS) power cables are connected.
a) The TCS power cables are connected to the Power Failover Gigabit Switch.
b) The TCS power cables are connected to the USB Failover Board.
c) The TCS power cables are connected to the PCC.
d) The TCS power cables are connected to the MM computer.
The TCS power cables are connected to the USB Failover Board.
Indicate what the incoming laboratory DI water pressure range should be.
a)0-20 psi
b)2-15 psi
c)5-20 psi
d)5-30 psi
5-30 psi
Identify the circuit breakers that allow for the switch off of individual devices on the Sample Handler.
A) MOTPWR(75VDC), 24VDC, 24VDC, SHC and UPS
B) MOTPWR(75VDC), 48VDC, 24VDC, SHC and UPS
C) MOTPWR(75VDC), 24VDC, 24VDC, Gantry and UPS
D) MOTPWR(75VDC), 24VDC, 24VDC, SHC and 48VDC
MOTPWR(75VDC), 24VDC, 24VDC, SHC and UPS
Function of CAN Network
a) Comunication between MM and DCM
b) Comunication between DCM and SH Interconect
c) Just A
d) A and B
A and B
DC power structure of the Magline
a) UPS- AC Distribution- 24VDC
b) AC Distribution - UPS - 24VDC Source -PFGS*
c) AC Distribution-DC Distribution- 24 VDC Source- PFGS
d) AC Distribution - DC Distribution- 24 VDC Backup- PFGS
AC Distribution-DC Distribution- 24 VDC Source- PFGS
Select the two Direct Load (DL) Sample Rack Positioner alignment targets that are used during installation.
A) PositionerSlot0Pos2atAliquotter
B) PositionerSlot1Pos2atAliquotter
C) PositionerSlot0Pos5atAliquotter
D) PositionerSlot1Pos5atAliquotter
A y C
Identify the acceptable degree for leveling the frame of the Sample Handler system.
a) 1.2 degrees
b) 0.9 degrees
c) 0.6 degrees
d) 0.3 degrees
0.3 degrees
Select the proper voltage selection procedure to perform during installation of the Chemistry or Immunoassay analyzer.
a)Measure the voltage at the wall and tap the instrument accordingly
b)Tap the instrument transformer according to the nominal utility service voltage
c)Do not change the voltage tap setting
e)Always ensure the voltage selection is set at 230V
Tap the instrument transformer according to the nominal utility service voltage
What's the difference between Ethernet Structure and CAN Network?
Comunication Network (across PFGs) and Control Network (across DML)
Identify the number of Master Boards (MB) on Path 500 of a SCI configuration.
A) 2
B) 3
C) 4
D) More than 3
3 Master Boards
Select the correct statements about the Control and Calibration Storage on the SH system. Select all that apply.
a) The Control and Calibration Storage has 63 tube positions.
b) During replacement of a TED it is recommended to use heat conduct paste.
c) The Control and Calibrator Storage has 3 tubes to release the condensation from the compartment to the liquid waste.
d) The Control and Calibrator Storage TEDs are controlled by the Hybrid DCM.
The Control and Calibrator Storage TEDs are controlled by the Hybrid DCM.
The Control and Calibration Storage has 63 tube positions.
Explain how to determine the correct Magline cable connection from the switches to the track segments.
a)Identify the SMN of the cable, follow CB-DOCs and look for SPI in or SPI out indication on the boards before connecting the cable.
b)Identify the color of the cables, follow CB-DOCs and look for SPI in or SPI out indication on the boards before connecting the cable.
c)Any cables can be used throughout the Magline.
d)Identify the MAC addresses of the cable and follow CB-DOCs.
Identify the SMN of the cable, follow CB-DOCs and look for SPI in or SPI out indication on the boards before connecting the cable.
Indicate which statement about incoming AC voltage is correct.
A) When working with incoming AC voltage, you do not need to turn off the instrument.
B) To work on incoming AC voltage or replacing a power supply it is enough to turn off the main circuit breaker. There is no need to unplug the wall outlet.
C) While working on incoming AC voltage it is only safe if the main circuit breaker is off and the wall outlet is unplugged.
D) There is no need for safety because we are trained CSE.
While working on incoming AC voltage it is only safe if the main circuit breaker is off and the wall outlet is unplugged.
Indentify the structure DCMs Hybrid
a) NPM y Node Controller
b) Node Processor Module and Carrier Board
c) Node controller and Carrier Board
d) None
Node Processor Module and Carrier Board
Identify the location where the MICS file can be uploaded to the Node Controller
a)Select MICS file from Magnemotion page.
b)Select Configuration Files from the Magnemotion page.
c)Select IP Settings from the Magnemotion page.
d)Select Motor Information from the Magnemotion page.
Select Configuration Files from the Magnemotion page.
Main differences between Sample Handler Prime and Sample Handler Auxiliary.
A) Sample Handler Prime has MM computers and Sample Handler Auxiliary has PCC and MM computers.
B) Sample Handler Prime has 1 PCC, 1 MM, and 2 DC power supplies and Sample Handler Auxiliary has MM computers and 3 DC power supplies.
C) Sample Handler Prime has 2 MM computers and 2 DC power supplies and Sample Handler Auxiliary has PCC and MM computers.
D) Sample Handler Prime has 1 MM, 1 PCC and 3 DC power supplies; and, Sample Handler Auxiliary has 1 MM computer and 2 DC power supplies
Sample Handler Prime has 1 MM, 1 PCC and 3 DC power supplies; and, Sample Handler Auxiliary has 1 MM computer and 2 DC power supplies.
Indicate where the level should be placed for final leveling of the Sample Handler and the most important component to level on the Chemistry (CH) analyzer during installation.
SH: Across the Drawers
CH: Reaction Ring