I've got the product
Crimping ain't easy
Innovation Nation
I've got the skills that pay the bills
Don't test me
100

This flexible jacket material is cool when things get hot.

Silicone

100

This is how long it takes our cable assembly team to build an M23 cable assembly.

30 minutes

100

This is the biggest challenge in meeting A/I data needs.

Energy

100

What sales resource did Philip O'Brien use to help find and win the HydroMet opportunity at Freeport McMoran

Field Application Engineers

100

Are customer visits to our ATPC test lab highly encouraged?

Yes!

200

This team sold the most CCS in 2024.

VMD

200

This information is needed to build a cable assembly

An engineering drawing

200

This power distribution cable can handle up to 35kv

MV-105

200

Who is at the center of the customer eco-system?

The end customer.

200
ATPC has this many types of cable flex testers in house.

4

300

This is the NPD timeline from concept to launch.

6 - 18 months

300

This piece of information leads to the most accurate cable assembly design and quote.

A working physical sample.

300

What type of data center opportunity should a TPC seller walk away from?

None of them!

300

This tool helps you expand share by identifying opportunities to sell more SKUs into your customers

Product Gap Analysis Tool

300

The ATPC test lab has this capability to support rapid prototyping needs.

3D Printing

400

This new product will provide an additional layer of protection from heat and molten splash regardless of cable used.

Thermo-Trex High Temp Blanket

400

This is the most important feature of a completed cable assembly

Pass 100% electrical testing

400
What ATPC solution could be used by a contractor to deploy MV-105 cables on-site at a data center build?

Trailer OR mobile deployment system

400

Customers today spend around 30% of their buying cycle doing this.

Gathering input internally.

400

This test simulates dragging and is best for comparing different jacket materials.

Abrasion testing
500

What product prevents motor & controller damage by protecting against discharge from voltage spikes?

Trex-Onics Hybrid Motor Cable

500

This is the most important question you should ask your customer.

Would you like a connector with that?

500

ATPC will become the leading industrial cabling solution for data centers from the _____ to the ____.

From the grid to the rack.

500

TAM stands for this

Total Addressable Market

500

The rolling S-bend usually tests within this cycle range.

100,000 to 1,000,000 cycles.

M
e
n
u