Safety
Sensei It Ain't So
You Down With SOP?
You Better Recognize - That Revenue
Did I Do That?
100

When a safety hazard is observed, team members are encouraged to Stop, Call, and do this.

Wait

100

This Sensei role will commit against proposed hours when a team member needs to be assigned tasks in a project.

Resource Manager

100

This document attempts to clearly outline roles and responsibilities within the Internal Project Team

RACI Matrix

100

Project Level Forecasts are a snapshot, and only reflect financials at a moment in time, but this report can be pulled in real-time and should be referenced to review project financial health.

PFR (Project Financial Report)

100

Name 3 items that a Project Management Team should be able to find in a Daily Site Report

Site Staffing, Material Deliveries, Safety Information, Work Performed, Relevant Photos

200

Once go-live is completed and the work area is no longer an active job site, the expectation is to continue wearing these items of PPE.

High-visibility safety vests and safety-toe footwear?

200

The remaining work on a schedule in POL is updated when team members do this.

Submit their timesheets

200

Spare parts are typically separated into commissioning spares and customer spares. Tell me when each should be fully available.

Commish - prior to commish start.

Customer spares - prior to go-live.

200

This report reflects pending vendor payments - and should be reviewed if stopping payment is being considered.

Payment Register Report

200

An OEM Vendor is attempting to collect final payment for a machine that is inconsistently hitting rate and has uptime concerns.  Who should I contact to ensure payment is not sent.

PAS or AP

300

Limit driving speed on powered industrial trucks to below this pace. (Within 1 mph).

5 mph

300

This value is used in POL for progress and earned value calculations (remember to set it!).

Status Date

300

These types of costs should be reviewed and cleared either by closing open POs or working with vendors to complete invoicing before project closure.

Committed Costs

300

This color on a PFR indicates $0 revenue in a specific category/subproject on a PFR - resulting in zero or negative profit.

Yellow

300

A customer is looking to descope a small part of their system temporarily to focus on throughput for the upcoming peak season - what document should the PM prepare to create clear expectations in this scenario?

Change Order

400

Bastian Solutions has 16 ORIs in calendar year 2023.  ORI stands for this.

OSHA Recordable Injury

400

These tasks - not able to be changed manually in an IS schedule - are linked from sub-schedules to track on-time delivery and accurately reflect delays.

Deliverables

400

This role is responsible for tracking and triggering contract billing milestones.

Project Manager

400

This color on a PFR indicates that committed costs plus costs incurred are greater than the forecast - resulting in a negative cost to complete.

Purple
400

A customer comes to a PM after system acceptance is achieved and has concerns about rate about an area which was not previously a concern.  What document should demonstrate design rate versus tested rate?

ORT Test Plan.

500

Lock Out / Tag Out is a process for isolating energy sources - name 4 of the 9 potential kinds of energy sources that may need isolated.

Electrical, Mechanical, Hydraulic, Compressed Gas, Radio Frequency, Thermal, Steam, Pneumatic, and Gravity

500

I want to update my schedule but need to understand the impacts sub-schedules may have before sycning.  I can use this option in POL to review before sync.

Manage Dependencies

500

In addition to an Integration walkthrough, these two walkthroughs with the customer should establish items for the final punchlist.

Static and Dynamic Walkthroughs

500

On 12/11/23, a Project Manager posted timesheet hours to Duluth SE (23-100246).  Tell me how many hours were on that transaction, and the total cost.

4 Hours, $592

500

OTD (On-Time Delivery) is a measure of a tasks actual finish date compared to it's what?

Due date or deadline date.