This code offers criteria for the installation and operation of gas piping and gas equipment on consumers premises.
What is NFPA 54?
Pipeline location markings shall be done in a manner that will last for a minimum of?
5 Days
Green stands for?
Sewers and Drain Lines
What is the newest Effective Date for OM 7?
08/17/2017
NFPA 54 shall apply to natural gas systems operating at ? PSI or less.
What is 125?
Orange stands for?
Communication, Alarm or Signal Lines, Cables, or Conduit
Who is the originating department?
Gas Engineering, Standards Compliance
The maximum operating pressure inside of a building shall not exceed ? PSI unless certain conditions are met.
What is 5 psi?
Company shall inspect plastic pipelines for what 3 main items before pipe is buried?
- damage
- gouges
- cuts
Yellow stands for?
Gas, Oil, Steam, Petroleum, or Gaseous Materials
What is the official name of OM 7?
Damage Prevention and Public Education
Polyethylene plastic pipe, tubing, and fittings used to supply fuel gas shall conform to ASTM “?” and pipe shall be marked “?” and ASTM “?”
What is D2513 / GAS / D2513
Installation and backfilling procedures must be done in accordance with which OM?
OM 67 Excavation & Backfilling
What 3 items are listed as a possible locating method in OM 7?
The Company will use the safety yellow paint, flags with the Company insignia printed on them, or Stake Chasers (Whiskers).
On which page would you find the Regulations?
Page 15
When field threading metallic pipe, sizes 1/2” to 1”, approximately how many threads need to be cut? How many for 1 1/4” to 2” metallic pipe?
What is the approximate length of the threaded portion?
What is 10 / 11 / .75 to 1”
Damage Prevention and Public Awareness Programs notifications, frequencies, and records can also be found in which OM?
OM 123 Public Awareness
What does APWA stand for?
American Public Works Association
How many colors are listed in the APWA UNIFORM COLOR CODE?
8 Colors