This type of glove must be worn whenever handling a knife or sharp objects.
What is Cut Resistant?
Product name, Safe handling instructions and reference to SDS are the three required elements of this.
What is a workplace label?
These must be set up when our work runs the risk of falling tools, equipment or material from overhead.
What is a control zone?
The number of stairwells that can be accessed to evacuate the building.
What is four?
An acceptable location to use the washroom while working on site, used for both number 1 and number 2.
What is a porta john or washroom?
These type of safety glasses should be worn whenever performing overhead work.
What are Sealed Glasses?
These should always be stored upright, secured from tipping over and labelled accordingly.
What is a compressed gas cylinder?
When working above this height or where an unusual hazard exists below, we MUST ensure we are properly tied off at all times.
What is 10'?
This location contains a 15-minute eyewash station, first aid kit and defibrillator.
What is the main trailer (Big Room Trailer)?
This place is commonly visited after work, to enjoy a nice cold one after our shift has ended and we've left site.
What is a pub or home?
This symbol should be found on all footwear worn in the PPE required zones.
What is a Green CSA triangle?
The two signal words associated with WHMIS 2015.
What are danger and warning?
While driving or operating equipment on the job site, we must not exceed this speed limit, at any time.
What is 15 KM/HR?
This number is used on site in the event of an emergency.
What is 911?
These animals are running around our site frequently.
What is a wild turkey?
Hearing protection is to be worn when workers are or may be exposed to noise in excess of this.
What is 85 dBA?
You can find a full inventory of these inside the Big Room trailer.
What are SDS?
Each morning, all workers are required to perform (or review and sign onto) one of these to identify hazards and control the possible exposure to those hazards.
What is a Task Hazard Assessment?
This many blasts of the air horn signals an evacuation.
What is 3?
These must be complete prior to operating ANY piece of equipment on site.
What is a pre-use inspection?
These four pieces of PPE MUST be worn at all times while on the project.
What are steel toe boots, hi-visibility clothing, safety glasses and hard hat?
11 is the number of these associated with WHMIS 2015.
What are Pictograms?
All new employees on site must receive an orientation on their first day on site at this time.
What is 7:30am?
This location is in the North West corner of site.
What is the Muster Point?
There are two acceptable locations for these on this site; one at the south end of Level 2 and the other at the parking lot on the north end.
What is a designated smoking area?